My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-04-08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-04-08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 10:54:06 AM
Creation date
4/4/2019 4:43:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/8/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.D. - Page 20 of 27 <br />Task 6.2: Utility Research <br />Consultant shall research subsurface utilities in the project extents and incorporate <br />utility agencies' record drawings of underground utility information into the survey <br />mapping. Where applicable, Consultant shall note storm drain and sanitary sewer <br />manholes, as well as underground pipes with pipe sizes, inverts, and direction. <br />Consultant shall provide up to one-half (0.5) days of mechanical utility locating to <br />supplement the utility information obtained from agency records. <br />Consultant shall compile available record utility information, drawings, maps, and third - <br />party utility agency information and include it with mapping. Consultant shall use this <br />information to work with the utility providers on any utility relocations. <br />Task 6.3:65% Plans, Specifications, and Estimates (PS&E) <br />Consultant shall further develop the plans and documents for the 65% submittal as <br />described below. The following are the plan sheets that shall be developed as part of <br />the 65% submittal and shall be refined as part of the 90% and final 100% submittals. <br />Note: City will process the environmental clearance for this project prior to the start of <br />this task. <br />Title Sheet <br />The Draft Title Sheet shall be prepared using the City's template and shall include an <br />inset map to show the location of the project within the City. It will also include a list <br />of the anticipated plan sheets as well as standards and benchmark references. <br />General Notes <br />Abbreviations, symbols and general construction notes and other relevant data shall <br />be shown on this sheet. <br />Demolition Plans <br />These sheets shall identify vegetation, hardscape, and structural elements (if any) to <br />be removed. Plans may also show underground and overhead utilities such as <br />sewer, water, electrical, gas, and telecom to be relocated or adjusted to grade. <br />Page 17 of 23 <br />REV: 03-2$-19 PR <br />ATTY/AGR.2019.074/Alta Planning + Design, Inc. <br />77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.