My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-04-08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-04-08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 10:54:06 AM
Creation date
4/4/2019 4:43:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/8/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.D. - Page 21 of 27 <br />Survey Control Plan <br />This sheet shall provide Right of way (ROW) lines and control information that was <br />used to establish the survey. This information may be used by the Consultant to <br />establish control for any alignments used in the plan set. <br />Layout Plans <br />These sheets shall show the horizontal layout of the street, drainage, and other <br />improvements including structures, median, curb, pedestrian ramps, traffic signals, <br />lighting, and existing drainage, and utility facilities. <br />Signage and Striping Plans <br />These sheets shall include signage and striping design for the street and pathways. <br />Consultant shall reference the City, Caltrans, CA MUTCD standards, and appropriate <br />references for sign, marking, and striping elements and locations. Plans shall identify <br />the standard referenced, size, color, and location of each, sign, marking, or stripe. <br />Grading Plans <br />Consultant shall prepare grading plans to show proposed gutter line grading for <br />proper drainage. Sidewalk grading shall be provided, as necessary, where grading <br />differs from the typical sections. <br />Drainage Plans <br />Consultant shall prepare drainage plans to show proposed storm drain modifications to <br />apply proper drainage in the existing storm drain system, as required. <br />Utility Relocation Plans <br />These plans shall show existing underground and over- head utilities such as sewer, <br />water, electrical, gas, and telecom that need to be relocated due to the project, as <br />required. <br />Traffic Signal, Lighting, and Electrical Plans <br />If traffic signalization is selected, Consultant shall use the base map to prepare <br />design -level plans showing the layout of the proposed traffic signal equipment, <br />including the location(s) of the signal controller/cabinet, poles, pedestrian countdown <br />signals, traffic signal interconnect, emergency vehicle pre-emption, traffic marking, <br />striping and signage design, intersection safety lighting, etc. Designs will be in <br />accordance with the City of Redwood City's current design standards, Caltrans design <br />standards, and the CA MUTCD guidelines. The design shall include any additional <br />detail and information needed for the traffic signal or electrical equipment to be <br />furnished and installed. <br />Page 18 of 23 <br />REV: 03-28-19 PR <br />ATTY/AGR.2019.074/Alta Planning + Design, Inc. <br />78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.