My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-08-07
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-08-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2006 9:01:13 AM
Creation date
8/3/2006 1:10:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
8/7/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 78 <br /> BRUCE LIEDSTRAND Page 12 <br /> COMMUNITY DESIGN DIRECTOR <br /> Redwood City should explore legal alternatives for using "value capture" to <br /> assist in transit funding. <br /> Integrating CaItrain into Downtown <br /> Aerial views of downtown confirm that the Caltrain railroad tracks run through <br /> downtown and cut the downtown Core area off from the shopping at Sequoia <br /> Station and the Franklin area residential development (See Aerial, Attachment 3). <br /> As a consequence, both Sequoia Station and the Downtown Core area turn their <br /> backs on the Caltrain line and a passenger arriving at the Downtown Redwood <br /> City station gets an unattractive "back door" view of Sequoia Station and the <br /> Core (See Photo, Attachment 4). <br /> To fix the problem two things need to be done: <br /> 1. The barrier of the Caltrain tracks needs to be eliminated by either raising <br /> or lowering the tracks as discussed in other areas of this paper, and <br /> 2. The Caltrain Station area needs to change from a "back door" to a <br /> "gateway" to downtown. <br /> Depot Circle, as presented to the City Council at prior meetings, is the key to <br /> creating this gateway (See Depot Circle Concept, Attachment 5). <br /> Redwood City should proceed with implementation of Depot Circle which <br /> involves several important steps. <br /> 1. After completion of the Caltrain "Footprint Study" for the Downtown <br /> station area and determination of the long-term Caltrain ROW needs, <br /> locate Depot Circle with relationship to the Caltrain ROWand complete <br /> the Depot Circle conceptual design. The Depot Circle design will result in <br /> some street realignment and adjustments in property boundaries, <br /> including the boundaries of Block 2. <br /> 2. Proceed with redevelopment of these properties adjacent to Depot Circle <br /> and use the new buildings to shape the space around Depot Circle. This <br /> shaping of the space by the adjacent buildings will help create Depot <br /> Circle as a special place in Downtown. <br /> - 9- <br /> - ,.-. <br />
The URL can be used to link to this page
Your browser does not support the video tag.