My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt00 Wilsey Ham
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2000
>
Agmt00 Wilsey Ham
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2008 10:16:34 AM
Creation date
3/18/2002 9:40:16 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Wilsey Ham
PROJECT NAME
Roosevelt Reconstruction Phase II
RMP File Number
304
Date
10/24/2000
Reso Ref
14080
Task Order
Yes
Box
6600
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Brian Lee <br />September 25, 2000 <br />Page 3 <br /> <br />Task 3 - Sewers <br />The sewer system has been previously designed. The previous design will be included in the <br />contract plans. Minor changes will be incorporated into these contract plans, such as a change in <br />pipe material, any major changes which involve redesign of the system or any appreciable portion <br />thereof, or any changes requested after the 35% review will be considered as extra work. <br /> <br />Task 4 - Water Lines <br />The water system has been previously designed. The previous design will be included in the <br />contract plans. Minor changes will be incorporated into these contract plans, such as changes in the <br />pipe size as determined by the City. Any major changes which involve a redesign of the system or <br />any appreciable portion thereof, or any changes requested after 35O/o review will be considered as <br />extra work. <br /> <br />Task $ - Drainage <br />Drainage from property to street will be maintained. City standards for minimum grades and cross <br />slopes will be adhered to. A new drainage system will be established to provide drainage facilities <br />for the new street cross section. <br /> <br />Task 6 - Signals <br />New signals will be designed for the Valota Avenue intersection. <br /> <br /> Task7 - Coordination <br /> Wilsey Ham will provide coordination with the City and with its subconsultant, RKH. City will <br /> coordinate the work of other consultants or agencies it has contracted with for various work which <br /> affect the project. <br /> <br /> Wilsey Ham will supply base mapping and the project layout plans to the City for their coordination <br /> with others. <br /> <br /> Task 8 - PS&E <br /> The plans, specifications and Engineers estimate will be compiled by Wilsey Ham. Wilsey Ham will <br /> coordinate PS&E by RKH and will include the undergrounding and lighting PS&E provided by the <br /> City in hard copy signed and in disk form. The Tide Sheet will be prepared for the total project. <br /> <br /> The civil plans will include the typical section sheet and special details. City standard details utilized <br /> will be included as 8 1/2" x 11" sheets in the back of the specifications. <br /> <br /> Throughout the project informal meetings will be held with City staff regarding issues and progress <br /> of the project. <br /> <br /> \\ACAD\P-DRIVE\PROJECT\275-46\09-25-00 Itt Brian Lee - Roosevelt Design.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.