My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord65 1197
RedwoodCity
>
City Clerk
>
Ordinances
>
1960-1969 partial
>
1965
>
Ord65 1197
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2008 12:21:14 PM
Creation date
11/14/2006 3:53:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Date
6/8/1965
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />II (b) Each application for an excavation permit in a <br /> <br />street or alley shall be accompanied by a nonrefundable fee <br /> <br />of Five Dollars ($5.00) and shall contain such information <br /> <br />as determined necessary by the City Engineer to determine <br /> <br />the location of work, the type and dimension of the pipe, <br /> <br />conduit, track or other faCility, the method of doing the <br /> <br />work and the materials to be utilized in restoring the <br /> <br />surface of the street or alley. <br />II (c) Each application for an excavation permit in any <br />other easement or right of way shall be accompanied by a <br />nonrefundable fee of Two Dollars ($2.00) and shall contain <br /> <br />such information as determined necessary by the City Engineer <br /> <br />to assure that any work performed, or any facility installed, <br /> <br />will not be inconsistent with or damage any existing or <br /> <br />prospective public facility in, or public use of, the ease- <br /> <br />ment or right of way. <br /> <br />"Section 29.47 <br /> <br />The City Engineer shall establish <br /> <br />such conditions for the permit as he finds necessary to <br /> <br />protect the public using the easement or right of way and <br /> <br />to protect present or prospective public improvements which <br /> <br />may be maintained therein. In addition to other appropriate <br /> <br />conditions, the following may be established: <br /> <br />II (a) The time and dates on which the work may be done. <br /> <br />neb) The supervision and safety precautions to be <br />employed, including the erection of barricades, <br />warning lights, signals and signs, and the <br />employment of personnel to direct traffic. <br /> <br />II (c) The number of calendar days, not to exceed 180, <br />for which the permit will be valid. <br /> <br />II (d) Tha t, in the case of a street or alley, the <br />applicant furnish complete plans, prOfiles and <br />specifications prepared by a licensed civil <br />engineer for all the work. <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.