My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 TRC Lowney
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Under $60K
>
Agmt06 TRC Lowney
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2008 9:32:20 AM
Creation date
1/3/2007 11:27:08 AM
Metadata
Fields
Template:
Agreement
Contractor Name
TRC Lowney
PROJECT NAME
Redwood Shores Library Engineering & Geotechnical Services
RMP File Number
304.5
Date
12/28/2006
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City of Redwood City <br /> <br />Redwood Shores Branch Library <br /> <br />SCHEDULE <br /> <br />We reviewed the project plans provided to us to estimate the approximate number of field <br />and office hours and the necessary laboratory testing required for the above services. A <br />construction schedule for the project was not available to us at the time this estimate was <br />prepared; however, if a project schedule becomes available, we would be happy to review our <br />construction estimate. All site earthwork is assumed to occur within normal working hours <br />Monday through Friday. Table 1 presents our estimated schedule of field, office and <br />laboratory services for construction work involving geotechnical engineering services. Please <br />note that our estimate does not include time for services performed due to problems or delays <br />that may be encountered during construction, and includes only part-time observation and <br />testing. <br /> <br />TABLE 1 . ESTIMATED SCHEDULE <br />FIELD SERVICES Estimated <br /> Personnel No. of Estimated Estimated No. of <br />Task Site Visits Hours Total l..ompaction <br /> Der Visit Hours Tests <br />Meetings and On-Site Consultation Project Engineer 4 2 8 0 <br />Mass Grading and Demolition Eng. Technician 3 4 12 10 <br />Pile Installation Staff Engineer 15 8 120 0 <br />Storm Drain Trench Backfill Eng. Technician 6 4 24 40 <br />Sewer Trench Backfill Eng. Technician 3 4 12 20 <br />Water Line Trench Backfill Eng. Technician 2 4 8 10 <br />Electrical/Gas Line Trench Backfill Eng. Technician 2 4 8 10 <br />Sidewalk Subgrade Compaction Eng. Technician 5 3 15 10 <br />Sidewalk Aggregate Base Compaction Eng. Technician 5 3 15 10 <br />Pavement Subgrade Compaction Eng. Technician 5 4 20 20 <br />Pavement Aggregate Base Compaction Eng. Technician 5 4 20 20 <br />Pavement Asphalt Concrete Compaction Eng. Technician 2 8 16 20 <br /> <br />TOTAL <br /> <br />57 <br /> <br />278 <br /> <br />170 <br /> <br />TRC Lo,T,ney <br /> <br />Page 3 <br />P15878 <br />
The URL can be used to link to this page
Your browser does not support the video tag.