My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 TRC Lowney
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Under $60K
>
Agmt06 TRC Lowney
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2008 9:32:20 AM
Creation date
1/3/2007 11:27:08 AM
Metadata
Fields
Template:
Agreement
Contractor Name
TRC Lowney
PROJECT NAME
Redwood Shores Library Engineering & Geotechnical Services
RMP File Number
304.5
Date
12/28/2006
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City of Redwood City <br /> <br />Redwood Shores Branch Library <br /> <br />OFFICE SERVICES <br /> Personnel Hours <br />Task <br />Review field reports; project tracking and Sr. Project Eng. 20 <br />management; correspondence with design Sr. Super. Tech. 15 <br />team and applicable agencies; Staff Engineer 15 <br />miscellaneous consultation and Dispatcher 4 <br />documentation' preparation of final letter. Tech. Asst. 2 <br /> <br />LAB SERVICES No. <br /> of <br />TVDe of Tests Tests <br />Compaction (ASTM D1557) 6 <br /> <br />TOTAL <br /> <br />56 <br /> <br />TOTAL <br /> <br />6 <br /> <br />COMMUNICATION AND REPORTS <br /> <br />We will provide a letter report presenting our comments regarding foundation and grading <br />plan review services. Oral reports of our field observations will be made on a regular basis to <br />the project representative. We will consider that representative responsible for dealing with <br />items of non-compliance. Unless otherwise requested, a written report of our findings and <br />opinion as to compliance will be issued at the completion of <br />our fieldwork at the site. Various agencies require that the <br />geotechnical consultant sign a statement that all phases of <br />construction requiring geotechnical observation were <br />completed according to their recommendations. Please note <br />that we will not be able to sign such a statement for your <br />project should those phases outlined in Table 1 of this <br />agreement be completed without our observation. In addition, any changes in the project <br />plans and specifications impacting the work to be observed by us should be brought to our <br />attention as soon as possible, and we should be provided with copies of the new data. <br /> <br />At the end of <br />construction, we will <br />provide, upon request, a <br />concise letter <br />summarizing our <br />services and opinion <br /> <br />CONTINGENCY SERVICES <br /> <br />It is common for us to be requested to perform additional services that are not outlined in <br />this agreement. Also, we are occasionally requested to retest areas of failed compaction or to <br />provide supplemental recommendations and observations that result from wet weather <br />grading problems, which are not included in this agreement. If we are requested to perform <br />additional services, or are requested to be on-site for periods of time which exceed the hours <br />shown in Table 1, we will proceed only with email or written authorization from your <br />designated representatives. We will then fax a "Notification of Additional Services," detailing <br />the requested additional services to your office. <br /> <br />TRC Lov,ney <br /> <br />Page 4 <br />P15878 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.