Laserfiche WebLink
Proposal for Professional Services <br /> Redwood City Branch Library in Redwood Shores <br /> Page 4 of l 4 <br /> September 13, 2002 <br /> <br />o Physical Limitations of Existing Library Facilities <br />o Space Needs Assessment <br /> <br />Community Advisory Cormmttee Meeting 2: Review L!~r~ ~?d~ A~e~ment Concepts <br />The Consultant team will prepare for, facilitate and document a CAC meeting to include: <br />o Review of Needs Assessment Concepts <br /> <br />Library Plan of Service <br />The Consultant Tea~ in ConjUnction With Library siaff ~d Core Team' a Library Plan Of Service which documents <br />the following: <br /> Mission Statement <br /> Goals and Objectives <br /> Services <br /> Jurisdiction-Wide Service <br /> Technology <br /> <br />Core Team Meeting 4: Site and Program Direction <br />Based upon the Needs Assessment and Library Plan of Service, the Core Team will determine site and program <br />direction foundational to the Operational Plan and Building Program, as well as the Site Analysis. <br /> <br />Operational Plan and Cost Model <br /> The Consultant Team will prepare for, facilitate and document (2) three-hour staff operational planning <br /> workshops to f'malize service delivery models and investigate operational impacts. <br /> Service Delivery Model <br />o Staffing Projections <br /> Services and Operations <br /> Growth Strategies <br />o Adaptive Reuse <br /> Conceptual Operational and Organizational Model <br /> The Consultant Team, in conjunction with Library Staff and the Core Team, will develop a projected operating <br /> cost model for the library as required by the Bond Act Application. <br /> <br />Library Building Program <br />The Consultant Team, working with Library and City Staff, will develop a Building Program that includes: <br /> Overview and Introduchon <br /> Qualitative Narrative <br /> General Requirements of the Library Building <br /> Spatial Relationships <br /> Summary of Facility Space Requirements <br /> Space Descriptions <br /> Preliminary Project Budget <br /> <br />Core Team Meeting 5: Review Library Building Program <br />The Consultant team will prepare for, facilitate and document a Core Team meeting to review the Library Building <br />Program. <br /> <br /> EXHIBIT A <br /> <br /> <br />