Laserfiche WebLink
CITY OF REDWOOD CITY, CALIFORNIA <br /> <br /> Public Works Services - RIGHT-OF-WAY MAINTENANCE <br /> <br /> CHANGE ORDER NO: l <br /> Sheet: I of I Original Contract Amount: 17~450.00 <br /> Date: November 23, 2002 Previous Change Orders: 0 <br /> Project: Hastings and Briarfield SkV Circuit This Change order: 11,464.93 <br /> Repair <br /> Accumulative Total: 28~914.93 <br /> <br /> To: S.G. Barber Construction, inc. <br /> You are hereby directed to make the herein described changes from the plans and specifications or do the following <br /> described work not included in the plans and specifications of this contract. All new work herein described shall be done in <br /> accordance with the applicable provisions of the plans and specifications, except es specifically modified by this contract <br /> change order. NOTE: This change order is not effective until approved by the City. This change order includes all costs and <br /> time required to complete the additional work described herein and the contractor shall be entitled to no other compensation. <br /> <br /> DESCRIPTION OF CHANGE COST <br /> <br />1. Repair conduit and pull wire for 240 Volt street light circuit - Labor $8,494.00 <br />2. Repair conduit and pull wire for 240 Voit street light circuit - Equipment $2,379~00 <br />3. Repair conduit and pull wire for 240 Volt street light circuit - Materials $591.93 <br /> TOTAL $11,464.93 <br /> <br /> By reason cf this proposed change 1S days extension of time will be allowed. <br /> <br /> The adjusted contract completion date will be ~ October 11~ 2002 <br /> <br /> Submitted By: Ralph Paoheco Title: Public Works Supsvisor Date 10/11/02 <br /> <br /> Approval Recommended: Gordon Mann /,}~ Title: Public Works Superintendent Date 10/14/02 <br /> <br /> We, the undersigned contractor, have given caretul consideration t~ the change proposed and hereby agree. If ~his change order is approved, <br /> we will provide all equipment, furnish all materials, except as may othen~se be noted above, end perform all services necessary for the work <br /> above specified, and will accept as full payment therefor the pHc. se shown above. <br /> <br /> Accepted by: Tire <br /> Contractor: Date <br /> C~ty Approval: Date <br /> <br /> c/lib/pw/coform/mstr <br /> <br /> <br />