Laserfiche WebLink
<br /> 2 <br /> 3 <br /> 4 <br /> 5 <br /> 6 <br /> 7 <br /> 8 <br />LIJ <br />Z 9 <br />0 <br />N <br />Z <br />:5 ~ 0 10 <br />OCli=w< <br />Z ~ !:: Z ,... 11 <br />:I:o::la:= <br />o ll. Ul 0 l'l <br />(,)II:~!!: ' <br />o ...I l'l <br />ZUL&l~Cll 12 <br />0...111: III <br />Cf)~t;;u5'" <br />ffi~~9~ 13 <br />~iiia:~[ <br />u Ul ::l U '" <br />o~~z~ 14 <br />z~1!li1i <br />oil.", <br />CI) ~ <br />z 15 <br />0 <br />a: <br />c( <br />c( 16 <br /> 17 <br /> 18 <br /> 19 <br /> 20 <br /> 21 <br /> 22 <br /> 23 <br /> 24 <br /> 25 <br /> 26 <br /> <br />gallons per day.) Any and all fines or other penalties levied against City as a result of the <br />flow from TCSAD exceeding the amount of an Annualized Daily Average Flow of 100,000 <br />gallons per day shall be borne wholly by Woodside. <br />Woodside shall be responsible for maintaining an accurate record of flow <br />discharged into District and City's Sewerage Facilities. Woodside's responsibility for <br />monitoring sanitary sewage flow discharged into City's/District's Sewerage Facilities shall, <br />at a minimum, be as follows: <br />Woodside shall maintain an accurate log of the operation of Woodside's TCSAD <br />pumping station and of the quantity of sewage pumped from said station into District's <br />Sewerage Facilities, and ultimatelYi into City's Sewerage Facilities. The quantity of <br />sewage emanating from the TeSAD pumping stations shall be recorded by an accurate <br />flow meters installed at the pump station. Said sanitary sewage flow data for the preceding <br />half of the fiscal year shall be transmitted by Woodside to City and District with each <br />biannual payment due pursuant to Section IV. of this Agreement. <br />City shall have the right to review Woodside's pumping and water consumption data <br />upon request. <br /> <br />VIII. INFILTRATION AND INFLOW <br />The parties hereto agree that no storm water sewer connections shall be permitted <br />to their respective sanitary sewage facilities systems and shall make every effort to <br />minimize and control any such infiltration and inflow. <br /> <br />IX. WOODSIDE'S FLOW METER. <br /> <br />Woodside has installed and will continue to maintain a sewer flow meter <br />("Woodside's Meter"). In addition, upon implementation of the expansion area shown in <br />Exhibit B, Woodside shall install a separate meter for that area, at a location and of a type <br /> <br />RWCIWDSIf.1r Oaks Agreement <br /> <br />10 <br />