Laserfiche WebLink
6.1 E <br /> Page 17 <br /> PROPOSED WORK PRQGRAAM1, SCl1F.DVI.F: A'�`D RUDGE'f FOR TfiF. PRL:SERVE AT REDWOOD SHURES <br /> nt:�xct+ xoo7 <br /> under-constr�iction,ar probable future projects.iVlitigation measures will be developecl to mitigate the <br /> prqjcci's contribution to sigriifica��t cumulative effects. <br /> The potential ��rowYh-inducing i�npacts of the proposed project wi11 also be evaluated. CEQA consi- <br /> ders a project to be��•owth-indLicing if it would f'oster economic or population growth. Exarnples of <br /> projects ihat typically would have growtla-indvcing impacts include exte�lsions or expansions of infra- <br /> structure beyond tha#needed to serve project-specif�c demand. Although significant�,nowth-inducing <br /> impacts are not anticipated,potential impacts will be evaluated to adequately describe thc naturc of <br /> the project in relation#o existing and proposed developmcnt. <br /> TASK F. CEQA-REQUIRED ASSESSMENT CONCLUSIONS <br /> LSA will prepare the appropriate conclusions to fulfill CEQA requirements by providing an assess- <br /> ment of several mandatory impac�categories, including: <br /> • LJnavoidable signaficant environinental iznpacts; <br /> • Significant irreversible environtnental changes; and <br /> • Effects faund not to be significant. <br /> On a preliminary basis,LSA anticipates that effects found not to be significant will include: <br /> • Agricultural Rcsources. <br /> • Mineral Resources. <br /> LSA will discuss these two topics with the City staff as part of?ask A.8,Work Program Refinement, <br /> to consider the level of description and evaluation th�t should be prepared for#hese topics as part of <br /> the EIR. <br /> TASI{ G. PREPARE DRAFT EIIt <br /> l. Administrative Draft EIR <br /> The informatic>n developeti in i asics E�through r will be organized:rto an�idmir,istrwtive L;uii,`"..0. <br /> The ELR is expected to include the following co�nponents: <br /> • introduction <br /> • Executive Summary <br /> • Project Description <br /> • 1'lanning Palicy Analysis <br /> • Setting, Impacts,and Mitigation Measures <br /> • Alternatives to the Proposed Project <br /> • C'umulative and Growth-Inducing Impacts <br /> • CEQA-Required Assessment Conclusions <br /> • I,ist of Pers�ns and Organizations C'ontacted <br /> C:�Doenmenu and Se�ieigs�dpasswisi\l.ocaf SeLLings\Tan�x�rxry in�mmt Flo`ALK li\Revised Seqx and BudGa as Convx�AlmeNmanAOC 14 <br />