My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-12-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-12-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2012 12:25:36 PM
Creation date
12/5/2002 3:47:58 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
12/9/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A� 9..�-30 <br /> ����_t►u��.�;� <br /> The revised project does incocpoiate changes &om tLe approved project (conditio� (1), above), but these <br /> changes would not croau any new environmrntal impacts. Some identi5ed impacts — in particuiar, those <br /> on �affic and parldng — would be affected, and those effects are discussed 'm this Addendum. Some <br /> changes in the circucnstances imder afiich the project is being underml�en (condition (2), above}�have „ <br /> occutred: the small incresses in the docvntown. parldng supply and decreases in downtown PaT1�nB <br /> demand would reduce, rather than increase, the severity of the identified impacts, while the potential traf- <br /> fic and parldng demand from the proposed 'Zittic Fox" theater space would increase the severity of iden- <br /> rified impacts on nights when events are scheduled for that space. - Some aew information relevant to the <br /> project (condirion (3), above) has become available (refined estimates of,parking supply and demand; <br /> same as the changes in circumstances noted fo; condition (2)), but t5is information does not indicau new <br /> environmental impacts. Therefore,_none of the throe conditions imder which a subsequeat EIIt would be <br /> prepared applies W this proposed revision of the approved project. <br /> The changes that have occuaed in the project and circumstances, and the new information that has <br /> become available, are discussed in this Addendiim to theEIIL- <br /> Additional Studies Conducted for EIR Addendum <br /> Updates of the analyses of haffic and parldng, initially prepared for the original project and all of the <br /> altemarives considered in the earlier EIIt, were commissioned; the findings of those analyses are <br /> described briefly below. The reports aze appended to this Addendum. <br /> a. Updated Traffic Anslysis <br /> A new traffic analysis was conducted by Fehr & Peers Associates (F&PA) to evaluate the potential <br /> impacts of the revised project on haff'ic conditions in the vicinity of tlte project site. The F&PA report is <br /> summarized in the appendix to this Addendum and is on file, along with its own technical appendix, at <br /> the City of Redwood Ciry Community Development Deparlment. <br /> With the eliminarion of the office component, the revised project would conbin less building space than <br /> the approved project. As a result, the number of daily vehicle hips would be lower. Trip generation <br /> estimates for the revised project are compared to estimates for the approved project in Table 2. Each trip <br /> is a one-direction vehicle movement entering or e�citing the downtown area. The numbet of vehicles <br /> being added to the downtown streets would be one-half the number of total hips. The number of daily <br /> trips occurs over a full 24-hour day; the number of peak hour tnps on Fridays occurs between 4:00 and <br /> 5:00 PM and on Samrdays between 3:00 and 4:00 PM. <br /> Table 2 indicates that: <br /> • The revised project would generate 818 fewer daily trips on a Friday and 33 fewer daily trips on <br /> Saturday than the approved project. These reductions represent 7 percent and 0 percent, respec- <br /> tively, of projected traffic with the approved project. The reason for the greater reduction on a Fri- <br /> day than on a Saturday is the elimination of the office space included on Block 2 of the approved <br /> project: offices generate much more traffic on a weekday than on a weekend day (when most <br /> offices are closed); therefore, the reduction that would result from eliminating the offices would be <br /> greater on a Friday than on a Saturday. <br /> • The peak hour uaffic volume reductions would also be greater during the Friday peak how than dur- <br /> ing the Saturday peak hour. The revised project would generate 118 fewer Friday peak hour trips <br /> and 19 fewer Saturday peak hour trips than the approved project, reductions of 10 percent and 1 <br /> percent, respectively. <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.