My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt07 Kennedy/Jenks Consultants
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2007
>
Agmt07 Kennedy/Jenks Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2007 11:38:58 AM
Creation date
7/11/2007 3:56:07 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy/Jenks Consultants
PROJECT NAME
Agmt for Professional Engineering Svc, Recycled Water Project - Phase 1 - Distribution System Design, Bay Front, Seaport, and Westport Project Area
RMP File Number
304
Date
7/9/2007
MO Ref
07-107
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />a. Design Criteria <br /> <br />b. Pipeline Alignment Analysis <br /> <br />c. Summary of Utilities Investigation <br /> <br />d. Summary of Permit Investigation <br /> <br />e. Engineer's Opipion of Probable Construction Costs <br /> <br />10. Participate in a Preliminary Design Review Meeting with City staff. <br /> <br />Task 3 - 90 Percent Design <br /> <br />Consultant shall provide the following work which constitutes a 90% level of design <br />development: <br /> <br />1. Coordinate potholing activities at up to 15 locations. <br /> <br />2. Prepare plan and profile drawings for up to 2,300 If of 14-inch distribution pipelines at 1" = <br />20'. <br /> <br />3. Prepare plan and profile drawing for up to 2,400 lineal feet of 12-inch branch pipelines at <br />I" = 20'. <br /> <br />4. Prepare detail drawings. <br /> <br />5. Prepare general drawings. <br /> <br />6. Prepare pipeline trench cross-sections (up to 3) with respect to adjacent utilities for review by <br />the City. <br /> <br />7. Incorporate service locations to customer sites provided by the site retrofit team. <br /> <br />8. Submit two sets of half-size drawings at the 50% level for State of California grant funding <br />review, and incorporate their comments into the 90% design. <br /> <br />9. Submit draft sets of drawings for City review up to four times prior to completion of the 90% <br />design. <br /> <br />10. Prepare contract documents including City front-end documents, bid lists, City and Engineer <br />technical specifications and other related documents for bid-build. <br /> <br />11. Prepare permit application for Union Pacific Railroad encroachments, for City's submittal to <br />Union Pacific Railroad. <br /> <br />12. Prepare 90% engineer's opinion of probable construction cost. <br /> <br />Agreement over $lOK <br />KennedyJenks Rev-2 112603 <br /> <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.