My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt07 Kennedy/Jenks Consultants
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2007
>
Agmt07 Kennedy/Jenks Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2007 11:38:58 AM
Creation date
7/11/2007 3:56:07 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy/Jenks Consultants
PROJECT NAME
Agmt for Professional Engineering Svc, Recycled Water Project - Phase 1 - Distribution System Design, Bay Front, Seaport, and Westport Project Area
RMP File Number
304
Date
7/9/2007
MO Ref
07-107
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5. Attend one pre-construction meeting. <br /> <br />6. Review and provide responses for up to 15 submittals of shop and working drawings of <br />manufacturers and contractors. These will be reviewed for substantial conformity with the <br />contract plans and specifications. <br /> <br />7. Prepare responses for up to 3 requests for information. <br /> <br />8. Prepare record drqwings based on markups provided by the construction manager. <br /> <br />9. Provide GIS conversion services by modifying the AutoCAD files for conversion, importing <br />the files into GIS, editing the feature geometry to comply with City requirements, attributing <br />the resulting files, and testing the files to verify the ability to import into H20NET, as <br />described under Record Drawings and GIS Conversion for Bid Packages 1 to 5. <br /> <br />BID PACKAGE 7 <br /> <br />Task 1 - Project Management <br /> <br />This task includes project management and administrative services necessary to complete the <br />tasks defmed in this scope of services (Tasks 2 through 5). These tasks include managing in- <br />house staff and subconsultants; monitoring the scope, schedule and budget; planning and <br />monitoring project activities; and preparing monthly budget status reports including invoices for <br />services. Ifthe project work extends beyond twelve months for design and bidding, or if the <br />scope of services is increased, a budget augmentation will be required for project management. <br />Tasks that are the same as for Bid Package 6 are not detailed below but are instead referred to <br />Bid Package 6. <br /> <br />Task 1.1 - Work Plan and Invoices <br /> <br />Same as Bid Package 6 <br /> <br />Task 1.2 - Project Meetings <br /> <br />Same as Bid Package 6 <br /> <br />Task 1.3 - City Progress Meetings <br /> <br />Same as Bid Package 6 <br /> <br />Task 1.4 - Purple Team Meetings <br /> <br />Same as Bid Package 6 <br /> <br />Task 1.5 - QA/QC Program <br /> <br />Same as Bid Package 6. <br /> <br />Agreement over $IOK <br />KennedyJenks Rev-2 112603 <br /> <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.