My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt07 Kennedy/Jenks Consultants
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2007
>
Agmt07 Kennedy/Jenks Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2007 11:38:58 AM
Creation date
7/11/2007 3:56:07 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy/Jenks Consultants
PROJECT NAME
Agmt for Professional Engineering Svc, Recycled Water Project - Phase 1 - Distribution System Design, Bay Front, Seaport, and Westport Project Area
RMP File Number
304
Date
7/9/2007
MO Ref
07-107
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7. Submit draft sets of drawings for City review up to four times prior to completion of the 90% <br />design. <br /> <br />8. Prepare contract documents including City front-end documents, bid lists, City and Engineer <br />technical specifications and other related documents for bid-build. <br /> <br />9. Prepare permit application for Caltrans and SBSA encroachments, for City's submittal to <br />Caltrans and SBSA. <br /> <br />~ <br />10. Prepare 90% engineer's opinion of probable construction cost. <br /> <br />11. Provide 3 copies of a 90% submittal of final design for City review, including: <br /> <br />a. Half-size Drawings; <br /> <br />b. Contract and Technical Specifications; and <br /> <br />c. Engineer's opinion of probable construction cost and schedule. <br /> <br />12. Participate in a 90% Review Meeting with City staff. <br /> <br />13. Provide two copies of 90% half-size drawings and specifications for State of California grant <br />funding review. <br /> <br />Task 4 - 100% Design <br /> <br />After incorporating the City's 90% review comments and State of California comments, <br />Consultant shall submit 3 copies of a 100% submittal including revised preliminary design <br />report, engineer's opinion of probable construction cost, design drawings and contract documents <br />for City's final review. After receiving City approval of the 100% submittal from City, the <br />Consultant shall deliver the following documents: <br /> <br />a) One set of full-size mylar stamped and signed final drawings, along with <br />specifications and contract documents; <br /> <br />b) One (1) copy of final quantity calculations and engineer's opinion of probable <br />construction costs. <br /> <br />All reports, plans, specifications and estimates shall be developed in computer format, including <br />the following: <br /> <br />a. Drawings: Computer Aided Design (CAD) on AutoCAD Release 2004 or later (by <br />Autodesk, Inc.), delivered on CD-ROM; <br /> <br />b. Specifications and reports: IBM PC/MS DOS compatible, CD-ROM, MSWord <br />compatible format; <br /> <br />Task 5 - Bidding and Construction Support <br /> <br />Agreement over $IOK 26 <br />KennedyJenks Rev-2 112603 <br />
The URL can be used to link to this page
Your browser does not support the video tag.