My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt07 Kennedy/Jenks Consultants
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2007
>
Agmt07 Kennedy/Jenks Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2007 11:38:58 AM
Creation date
7/11/2007 3:56:07 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy/Jenks Consultants
PROJECT NAME
Agmt for Professional Engineering Svc, Recycled Water Project - Phase 1 - Distribution System Design, Bay Front, Seaport, and Westport Project Area
RMP File Number
304
Date
7/9/2007
MO Ref
07-107
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Same as Bid Package 6 <br /> <br />Task 1.4 - Purple Team Meetings <br /> <br />Same as Bid Package 6 <br /> <br />Task 1.5 - QAlQC Program <br /> <br />Same as Bid Package 9 <br /> <br />Task 2 - Preliminary Design <br /> <br />Consultant shall provide the work that constitutes a preliminary level of design development, <br />using the same scope of work as for Bid Package 6 excepted as noted below: <br /> <br />1. Coordinate surveying and mapping to be performed by our subcontractor, Bohley Consulting: <br /> <br />a. Prepare plats and legal descriptions across the lands of West port Office Park for the <br />proposed construction of recycled water lines. The location of these lines will be within <br />Island Drive and Bridge Parkway. The following items will be provided by the City <br />and/or the Consultant: <br /> <br />1) A preliminary title report of the properties through which the recycled water line <br />traverses will be provided by the City. <br /> <br />2) The actuallocation(s) ofthe recycled water lines and any laterals therefrom in <br />Autocad format will be provided by the Consultant. <br /> <br />3) The width(s) of the proposed easements will be provided by the Consultant with input <br />by the City. <br /> <br />b. Provide Consultant with Subcontractor's Autocad 14 files of the Westport project. It is <br />understood that the files were used to prepare construction drawings for the Westport <br />Project (which files and drawings are a matter of public record with Redwood City) but <br />may not represent the actual locations of installation of the underground utilities. <br /> <br />2. Refine the design criteria to reflect the design of utilities within a former landfill. <br /> <br />3. Assist City with developing an easement agreement for Westport. It is understood that the <br />City will be responsible for the easement negotiations, and the Consultant will provide <br />assistance as requested. <br /> <br />Task 3 - 90 Percent Design <br /> <br />Consultant shall provide the following work which constitutes a 90% level of design <br />development: <br /> <br />Agreement over $1 OK <br />KennedyJenks Rev-2 112603 <br /> <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.