My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt07 Kennedy/Jenks Consultants
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2007
>
Agmt07 Kennedy/Jenks Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2007 11:38:58 AM
Creation date
7/11/2007 3:56:07 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy/Jenks Consultants
PROJECT NAME
Agmt for Professional Engineering Svc, Recycled Water Project - Phase 1 - Distribution System Design, Bay Front, Seaport, and Westport Project Area
RMP File Number
304
Date
7/9/2007
MO Ref
07-107
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1. Coordinate potholing activities at up to 15 locations. <br /> <br />2. Prepare plan and profile drawings for up to 5,900 If of 8-inch and 14-inch distribution <br />pipelines at 1" = 20'. <br /> <br />3. Prepare detail drawings. <br /> <br />4. Prepare general drawings. <br /> <br />>{ <br />5. Prepare pipeline trench cross-sections (up to 3) with respect to adjacent utilities for review by <br />the City. <br /> <br />6. Submit two sets of half-size drawings at the 50% level for State of Cali fomi a grant funding <br />review, and incorporate their comments into the 90% design. <br /> <br />7. Submit draft sets of drawings for City review up to four times prior to completion of the 90% <br />design. <br /> <br />8. Prepare contract documents including City front-end documents, bid lists, City and Engineer <br />technical specifications and other related documents for bid-build. <br /> <br />9. Assist City with preparing easement application for Westport. <br /> <br />10. Prepare 90% engineer's opinion of probable construction cost. <br /> <br />11. Provide 3 copies of a 90% submittal of final design for City review, including: <br /> <br />a. Half-size Drawings; <br /> <br />b. Contract and Technical Specifications; and <br /> <br />c. Engineer's opinion of probable construction cost and schedule. <br /> <br />12. Participate in a 90% Review Meeting with City staff. <br /> <br />13. Provide two copies of 90% half-size drawings and specifications for State of California grant <br />funding review. <br /> <br />Task 4 -100% Design <br /> <br />After incorporating the City's 90% review comments and State of California comments, <br />Consultant shall submit 3 copies of a 100% submittal including revised preliminary design <br />report, engineer's opinion of probable construction cost, design drawings and contract documents <br />for City's final review. After receiving City approval of the 100% submittal from City, the <br />Consultant shall deliver the following documents: <br /> <br />a) One set of full-size mylar stamped and signed final drawings, along with <br />specifications and contract documents; <br /> <br />Agreement over $1 OK <br />KennedyJenks Rev-2 112603 <br /> <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.