Laserfiche WebLink
7B <br /> Page 3 <br /> industrial use previously. The overall range of land�uses included within the Plan are <br /> infill residential/mixed-use development, limited locally-oriented commercial space, <br /> frontage streetscape improvements, and a publicly-accessible Redwood Creek trail <br /> segment as weli as retention of tl�e existing uses such as the new ofFice building at 305 <br /> Main Stree#. A potential crossing under U.S. 101 is anticipated to eventually connect <br /> this trail segment with a future pedestrian pathway in the Bayfront area on the east site <br /> of U.S. 101. The trail crossing under U.S. 101 is a separate project, dependent upon <br /> other project approvals and would undergo environmental review when more fully <br /> deve[oped. <br /> Another objective of the Precise Plan is to improve pub(ic access to Redwood Creek. In <br /> the future a designated patl� abutting the creek's southern bank will be constructed <br /> along the rear os all the properties that are wiihin the Precise Plan area. This path will <br /> be required when a property within the Precise Plan is redeveloped or undergoes �n <br /> addition of 5� percent (of the gross floar area) or greater. <br /> t3iscUSSi6t�iissi�es <br /> An adjoining property owner has concerns that his three-story office building located at <br /> 305 Main Street would be rendered obsolete should the proposed Precise Plan be <br /> approved. This is not the case. Shortly after the April 17, 2007 Planning Commission <br /> meeting, staff met with the property owner/representative and reviewed the draft plan <br /> ianguage with him, specifically that the proposed North Main Street Precise Plan does <br /> not mandate change to any property. The Precise Plan would only impact his or any <br /> other property ifi his building was demolished or if an addition of 50 percent or greater <br /> was proposed to be constructed. The existing use of #his property could continue <br /> without any repercussion. Moreover, the proposed Precise Plan will continue to allaw <br /> office use� within Area "A", which includes 305 Main Stree#. The ffaor area ratio <br /> allowance will also be increased fram 40 percent to 50 percent. <br /> At the July 10, 2007 Planning Commission hearing fihe property owner/representative of <br /> �p5 �,n�;;� c�;-oo± �ya;n ;-��Sed concerns regarding the effect of the �ropnsPd Pr�ci�e <br /> Plan on his property and the impact of the creek path on his parking lot; but after <br /> discussion and further clarification by the Planning Commission and staff, he seemed <br /> conten# that his concerns were heard and addressecf. <br /> Lastl;�, the praposed creek trail/path required by the Precise Plan that abuts Redwood <br /> Creek at the rear of the properties is not expected to impinge on this or other existing <br /> uses. Staff suggested some alternate language to clarify these topics, especially with <br /> respect to the creek path, and we expect the property owner to be satisfied with the <br /> revisions. Staff was unaware that the property owner remained concerned and was thus <br /> surprised when an July 25, 2007, a letter addressed to Council from the attorneys <br /> representing the corporation that owns 305 Main Street was submitted requesting that <br /> this property not be incluc{ed in the proposed Precise Plan (Attachment 6). <br /> General P[an and Zoning Amendments <br /> The Precise P1an does not comply with the existing General Plan and Zoning land use <br /> maps. The project �herefore requires a General Plan Amendment to allow residential <br /> develapment in an area that has historically been designated for industrial and <br /> commercial uses. A Zoning Map Amendment is also required and inc�udes the rezoning <br />