My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC19-02 PC Reso 0018 Granting Conditions of Approval for 1690 Broadway
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2019
>
Reso PC19-02 PC Reso 0018 Granting Conditions of Approval for 1690 Broadway
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 2:50:57 PM
Creation date
6/24/2019 2:45:32 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
3/5/2019
Text box
ID:
1
Creator:
Created:
6/24/2019 2:45 PM
Modified:
6/24/2019 2:45 PM
Text:
https://library.municode.com/ca/redwood_city/codes/zoning?nodeId=ART29REAFHO_29.3AP
ID:
2
Creator:
Created:
6/24/2019 2:45 PM
Modified:
6/24/2019 2:45 PM
Text:
https://library.municode.com/ca/redwood_city/codes/code_of_ordinances?nodeId=CH45PUAR
ID:
3
Creator:
Created:
6/24/2019 2:45 PM
Modified:
6/24/2019 2:45 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXVTRIMFE
ID:
4
Creator:
Created:
6/24/2019 2:45 PM
Modified:
6/24/2019 2:45 PM
Text:
http://www.redwoodcity.org/home/showdocument?id=2002
ID:
5
Creator:
Created:
6/24/2019 2:45 PM
Modified:
6/24/2019 2:45 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH38WASYRE
ID:
6
Creator:
Created:
6/24/2019 2:45 PM
Modified:
6/24/2019 2:45 PM
Text:
http://www.seq.org/%2Buploaded/file_1677.pdf
ID:
7
Creator:
Created:
6/24/2019 2:45 PM
Modified:
6/24/2019 2:45 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.241STIMTRTR
ID:
8
Creator:
Created:
6/24/2019 2:45 PM
Modified:
6/24/2019 2:45 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH29STSIWOUSRI-W_ARTIIICORESIDR
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ordinance and implementing resolution.[SDR] [PLANNING AND HOUSING] <br />4. Public Art Fee - Pay a Public Art Fee for the proposed project, calculated at <br />1% of construction value. [SDR] [PARKS&REC] <br />5. Transportation Impact Fee - Pay a Transportation Impact Fee for the net <br />new trips resulting from the proposed project. The fee is estimated at <br />$88,263.47. [SDR] [ENGINEERING] <br />6. Water and Sewer Fees - Pay applicable water, recycled water, and <br />wastewater -related fees as outlined on the City's website. The fee is <br />estimated at $264,709 for Water fee, $19,200 for Wastewater Capital <br />Facilities, $145,433 for Wastewater Treatment Capacity, $143,267 for <br />Wastewater Inflow and Infiltration fee. [SDR] [ENGINEERING] <br />7. School Impact Fee - If applicable, pay a School Impact Fee to the <br />Sequoia Union High School District. Information regarding this fee may be <br />obtained by contacting the Sequoia Union High School District at (650) <br />369-1411. [SDR] [SCHOOL DISTRICT] <br />8. Notice Of Fees Protest - The applicant may protest any fees, <br />dedications, reservations, or other exactions imposed by the City as part of <br />the approval or as a condition of approval of this development. Per <br />California Government Code Section 66020, this 90 -day protest period <br />has begun as of the date of the approval of this application. [SDR] [OFFICE <br />OF THE CITY ATTORNEY] <br />Site Improvements <br />9. Bicycle Parking - Provide for 12 bicycle parking spaces total including, eight <br />covered bicycle storage spaces in the parking garage, four bicycle racks in <br />the public right-of-way, which should be demonstrated on the building <br />permit plans. [COA] [ENGINEERING] <br />10. Street Trees - A total of 13 (24 -inch box) street trees shall be planted <br />along The Marshall Street, Beech Street, and Broadway Street frontages. <br />The tree species and location will be determined by the City Arborist. <br />These improvements shall be included as part of the building permit <br />submittal package. Newly planted trees shall be both irrigated and <br />maintained by the applicant. [SDR] [PLANNING] <br />11. Repair or Replace Street Infrastructure - The applicant shall replace or <br />repair street, curb, gutter, driveway approaches, sidewalk and streetscape <br />treatment to City standards and as determined by the City Landscape <br />Architect. [SDR] [ENGINEERING] <br />12. Street Design and Driveways - Changes to streets or driveways, <br />including replacement of abandoned driveways, shall conform to <br />ATTY/RESO.0018/PC RESO GRANTING CONDITIONS OF APPROVAL FOR 1690 BROADWAY <br />REV: 02-27-19 PR <br />Page 10 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.