My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC19-03 PC Reso 0024 Architectual Permit 120 El Camino Real - Revised
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2019
>
Reso PC19-03 PC Reso 0024 Architectual Permit 120 El Camino Real - Revised
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 2:51:16 PM
Creation date
6/24/2019 2:46:13 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
4/2/2019
Text box
ID:
1
Creator:
Created:
6/24/2019 2:46 PM
Modified:
6/24/2019 2:46 PM
Text:
https://library.municode.com/ca/redwood_city/codes/code_of_ordinances?nodeId=CH30SU_ARTVMIRE_S30.69EX
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The proposed Project would not conflict with any public easements as there are <br />none on the site. The project would provide public access easements for <br />emergency vehicles and for trash collection. <br />E. The reasons submitted for the granting of any exceptions applied for do not <br />comply with requirements for findings described in Section 30.69, and the <br />tentative map is deemed not workable without the granting of such <br />exceptions. <br />No exceptions to the Subdivision Ordinance are requested. <br />F. Such other findings of conflict with written public policy or with the public <br />interest as the Planning Commission may determine. <br />The proposed map does not conflict with any written public policy or with the public <br />interest. <br />Section 7. Vesting Tentative Map TM2018-007: Pursuant to Government Code <br />Section 66473.5, the Planning Commission finds that the proposed subdivision, <br />together with the provisions for its design and improvement, is consistent with the <br />General Plan as described in the staff report. <br />Section 8. Condominium Permit CP2019-001 (Article XI of the Subdivision <br />Ordinance): The Planning Commission finds that: <br />Pursuant to Articles III and XI of Chapter 30 of the Municipal Code <br />(Subdivisions), the Project also requires approval of a Condominium Permit. Upon <br />approval of the Vesting Tentative Map, the Project site would consist of one parcel that <br />would be subdivided for condominium purposes. <br />Section 30.130 states: "While condominium and community apartment projects <br />present benefits in the nature of increased amenities, opportunities for dwelling <br />ownership and leisure time, the special nature of such projects creates conditions that <br />may result in neglect, deterioration and lack of maintenance, causing negative impact <br />upon the health, safety, welfare and economic prosperity of the City and its citizens. <br />Because of the unique nature of the problems created by condominium and community <br />apartment projects, it is the express intent of the City to treat such projects differently <br />from other types of multifamily dwellings and to establish rules and standards thereof, <br />regulating the construction of, and conversion to, condominium projects and community <br />apartment projects in the City." <br />The Project as proposed complies with the requirements of Article XI of the <br />Subdivision Ordinance as the project proposes meter and control valves, noise and <br />Page 8 of 19 <br />ATTY/DOCS-RESOLUTIONS/2019/RESO.0024 PC RESO ARCHITECTUAL PERMIT 120 EL CAMINO REAL <br />REV: 04-03-19 PR <br />
The URL can be used to link to this page
Your browser does not support the video tag.