Laserfiche WebLink
nut is not exposed, a note of the field condition shall be added to the base <br />map. <br />iv. Gas valve boxes and gas lines. <br />v. Traffic signal boxes, street light boxes, utility vaults, electrical poles, loop <br />detectors, traffic sign posts, street lights, and electrical lines. <br />vi. Cable TV boxes, Cable TV lines, telephone poles, telephone lines and <br />overhead lines. <br />vii. Fiber optics communication lines. <br />viii. Street monuments and/or benchmarks. <br />ix. Tax assessors lot lines, Property line or lot boundaries, easements and <br />right-of-way lines, house addresses (approximate, from City Block Books <br />and County Recorder/Maps office), water services, gas services and <br />sewer laterals. <br />x. Curb & gutter, sidewalks, driveways and wheelchair ramps within the right <br />of way with minimum diameter 6 -inches at breast height and street facing <br />fences within the right of way (indicate fence type/material). <br />A. Trees and fences. <br />c. Base map shall be completed in Autodesk Civil 3D and converted to <br />AutoCAD 2009 version (using the City's standard CAD layers) at a scale of <br />V=20'. Text information and other entities shall be readable at this scale <br />when plotted on a plan and profile sheet. Final plotted text height shall be <br />0.1". <br />L Survey station shall be at center line of street at 50 feet intervals, 25 feet <br />stations on curves, beginning at centerline of street intersections or <br />manholes as noted on the location map (see attached location map). <br />Indicate the following items: spot elevations at each 50 foot station, center <br />line, lip of gutter or edge of pavement, face of curb at flow line, back of <br />curb, sidewalk, planting strip or landscape area and right-of-way line or <br />property line. <br />ii. Base map topographic survey shall extend 25 feet beyond centerline of <br />end manholes and/or shall extend 50 feet beyond street intersections in all <br />possible directions. Please see attached location map for reference. <br />iii. Survey stationing 1+00 shall start at centerline of street intersection or <br />centerline of manholes unless otherwise noted. Please see attached <br />location map with notations of recommended starting point of Station. <br />iv. Redwood City Datum shall be used in preparing the topographic survey. <br />The City will provide the location of the nearest benchmark if required. <br />Benchmark information used shall be noted on the topographic survey. <br />North American Vertical Datum of 1988 (NAVD88) shall be used. All data <br />on other vertical datums shall be converted to NAVD88. The North <br />Page 11 of 13 <br />REV: 07-19.19 DZ <br />ATTY/AGR.2019.206/BKF Engineers, Surveyors, Planners <br />