My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 BKF Engineers, Surveyors, Planners
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 BKF Engineers, Surveyors, Planners
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2021 12:36:00 PM
Creation date
9/9/2019 8:58:11 AM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers, Surveyors, Planners
PROJECT NAME
On call as needed professional surveying services
RMP File Number
304
Date
9/2/2019
MO Ref
19-168, 21-144
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
American Datum of 1983 (NAD83) shall be used as horizontal and <br />geometric control datum. <br />v. The Consultant shall request the As-Built/Record Drawings from utility <br />companies (e.g. Comcast, PG&E, AT&T, Pacific Bell, SVCW, MCI, <br />SFPUC, Calwater, RCN, SVCW, etc.) to the selected consultant for <br />inclusion in the survey base map. The City will provide an endorsement <br />letter stating that the Consultant is requesting the information on behalf of <br />the City. <br />vi. The City will provide a sample of an approved topographic survey drawing <br />to be used as reference to conform to City requirements. <br />vii. The City will provide block book drawings to be used as reference in <br />conjunction with the surveyed features stated above to determine <br />alignment of underground utilities. The size and materials of the utilities <br />from the block book drawings shall be checked against the field <br />measurements. Sizes and materials of the utilities shall be shown on the <br />base map. <br />d. Project's Close -Out Meeting with the City. <br />i. Consultant shall meet with the City and prepare an agenda to discuss the <br />project's deliverables. <br />Deliverables of the base map include but not limited to: <br />• City approved AutoCAD 2009 and Autodesk Civil 3D drawing files <br />(including all point files) of the Project Limits <br />• Record drawings requested from utility companies in PDF format <br />2. The Consultant shall perform Boundary Survey, as requested, for the City by <br />researching record maps on file with the County of San Mateo, City right-of-way <br />and title records, and applicable deeds under the supervision of a Licensed Land <br />Surveyor. The Consultant shall locate all controlling monumentation shown and <br />reference in public records. The Consultant shall also tie the controlling <br />monumentation to the project, boundaries. <br />3. The Consultant shall prepare, as requested, a Legal Description of the real <br />properties and right -of- way within the RAUUD; and shall be written, signed & <br />stamped by the Consultant's Licensed Land Surveyor. <br />4. Other requested surveying task from the City. <br />1.2 TIME SCHEDULE: <br />The duration of the Agreement will be effective for a period of two (2) years from the <br />date first above written and may be extended with City Manager's approval. <br />Page 12 of 13 <br />REV: 07-19-19 D2 <br />ATTY/AGR.2019.206/BKF Engineers, Surveyors, Planners <br />
The URL can be used to link to this page
Your browser does not support the video tag.