Laserfiche WebLink
The schedule for the survey work shall be on an on-call, as needed, as requested basis. <br />Final approved deliverables schedule will be determined and coordinated by the City <br />and Consultant at the time of request. <br />1.3 FEE SCHEDULE: <br />The Consultant shall perform the above mentioned services as requested for a not -to - <br />exceed fee of $350,000.00. This contract is purely time and material on an on-call, as - <br />needed basis to be determined by the City. The Consultant shall be paid incrementally <br />at an hourly rate based on actual survey work performed and delivered. <br />The Consultant shall perform the work at the prices outlined on the Fee Schedule <br />below. Final approved scope of work including total cost will be determined and <br />negotiated by the City and Consultant at the time of request. <br />FEES <br />Role <br />Hourly Rate <br />Senior Associate <br />$220.00 <br />Associate <br />$214.00 <br />Project Manager <br />$204.00 - $210.00 <br />Surveyor I, II, III, IV <br />$134.00 - $154.00 - $174.00 - $189.00 <br />Survey Party Chief <br />$175.00 <br />Survey Chainman <br />$113.00 <br />Apprentice I, 11, III, IV <br />$70.00 - $93.00 - $103.00 - $109.00 <br />Instrumentman <br />$150.00 <br />Surveying Assistant <br />$82.00 <br />Junior Surveyor <br />$70.00 <br />Utility Locating Superintendent <br />$176.00 <br />Utility Locator I, II, III <br />$91.00 - $129.00 - $155.00 <br />BIM Specialist I, ll, III <br />$134.00 - $154.00 - $174.00 <br />Page 13 of 13 <br />REV: 07-19-19 DZ <br />ATTY/AGR.2019.206/BKF Engineers, Surveyors, Planners <br />