My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Gilbane Building Company
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 Gilbane Building Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2026 11:48:36 AM
Creation date
9/18/2019 12:18:06 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Gilbane Building Company
PROJECT NAME
Project managemente & inspectation services for Vet Memorial/Senior Center project
RMP File Number
304
Date
9/16/2019
MO Ref
19-179,21-170
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.7.1 Review of Proposals and Recommendation. Recommendations for Specialty <br />Consultant services contract. The PM shall review submitted responses to RFP/Q <br />proposals to determine: <br />(i) whether the Specialty Consultant submitting the proposal is qualified to perform the <br />scope of work; and, <br />(ii) whether the proposal includes qualifications or exclusions. <br />PM shall make recommendations to the CITY regarding: <br />(i) proposal rating based on RFP/Q scoring criteria; and, <br />(ii) proposed Specialty Consultant fees. <br />The PM shall make recommendations to the CITY for award of the Specialty <br />Consultant services contract for the Project. As requested by the CITY, the PM <br />shall assist the CITY in preparing the Specialty Consultant contract for execution <br />and other related administrative tasks in connection with the Specialty Consultant <br />contract awarded by the CITY for the Project. <br />1.8 Construction Management Plan. The PM shall develop a Construction <br />Management Plan ("Plan") for the Project that details the steps required to <br />achieve Project goals established by the CITY. The PM shall provide the Plan <br />for CITY review and incorporate CITY comments. In the event the PM does not <br />agree with CITY comments, PM shall meet with CITY to review and resolve <br />comments to be incorporated into final Plan. Plan shall include and may not be <br />limited to: <br />(i) Project controls system; <br />(ii) Communication and decision-making authority structure; <br />(iii) Points of contact <br />(iv) Quality, safety, and performance requirements; <br />(v) Logistics plan(s) for site and construction sequencing and phasing; <br />(vi) Air, dust, stormwater, sediment, noise, and traffic management and control; <br />(vii) Site security, access, and utilization constraints; and, <br />(viii) Public safety and public outreach/ communications. <br />If needed, this Plan shall meet the CITY's building permit requirements. <br />PM shall review CITY standard Division 00 and Division 01 (or equivalent) <br />documents ("Front End Documents"). Upon PM review of Front End Documents, <br />PM shall incorporate the Plan into the Front End Documents; and to avoid <br />conflicts between Plan and Front End Documents, PM shall recommend edits to <br />Front End Documents to CITY for incorporation into the final bid documents. <br />2.0 BID & CONTRACT AWARD (TASK 2) <br />2.1 Review and Assembly of Bid Documents. The PM shall review the CITY's standard <br />forms of bid and contract documents to prepare bid documents for the Project. <br />The PM shall revise the CITY's standard form of bid and contract documents to <br />incorporate specific needs or requirements of the Project and submit the same to <br />REV: 08-21-19 PR <br />
The URL can be used to link to this page
Your browser does not support the video tag.