My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Gilbane Building Company
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 Gilbane Building Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2026 11:48:36 AM
Creation date
9/18/2019 12:18:06 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Gilbane Building Company
PROJECT NAME
Project managemente & inspectation services for Vet Memorial/Senior Center project
RMP File Number
304
Date
9/16/2019
MO Ref
19-179,21-170
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.0 CONSTRUCTION PHASE (TASK 3) <br />3.1 Administration and Coordination of Construction Contract and Construction. PM will <br />provide administrative, management and related services necessary to administer <br />the construction contractforthe Project, including, without limitation: <br />(i) Ensure that the Contractor performs the requirements of the construction contract <br />documents and enforce the Contractor's construction contract; <br />(ii) Receive, review for compliance, and forward to the CITY the contractor(s)' <br />certificates of insurance and bonds. Where requirements are not met, PM will <br />obtain compliance from contractor(s); <br />(iii) Advise, recommend, and prepare for the CITY the Notice(s) to Proceed directing <br />commencement of construction of the Project or portions thereof; issuance of the <br />Notice(s) to Proceed on behalf of the CITY as directed or authorized by the CITY; <br />(iv) Schedule, coordinate and conduct pre -construction and construction meetings; <br />recording, maintaining and distributing minutes thereof within two (2) working days; <br />(v) In consultation with the CITY and Architect, develop and implement procedures for <br />the submittal, processing, and tracking of submittals; <br />(vi) In consultation with the CITY and Architect, develop, implement procedures for the <br />handling and disposition of the Contractor's requests for information ("RFI") or <br />clarifications, and tracking of this information; <br />(vii) Establish, implement procedures, and track the transmittal and receipt of <br />communications, drawings and other information between PM, Architect and the <br />Contractor relating to construction of the Project; <br />(viii) Assist the CITY in selection and retention of testing/inspection service providers; <br />(ix) Review the Contractor's construction schedules and implement provisions of the <br />construction contract relating to the Contractor's obligations for development, <br />maintenance, updating and compliance with the construction schedule for the <br />Project; <br />(x) Establish site access, staging, lay down and storage areas; and, <br />(xi) Provide monthly progress reports with schedule and budget updates; <br />(xii) Monitor LEED construction certification; and, <br />(xiii) Assist CITY with public outreach. <br />The PM's services relating to Project communications shall utilize forms, <br />processes and other measures implemented by the CITY in connection with <br />construction of the Project, including without limitation, the document control <br />management system implemented by the CITY for the Project. If there is no <br />system, PM shall devise a document control management system, with CITY's <br />approval. <br />3.2 Construction Phase Meetings and Conferences. The PM shall conduct meetings <br />and conferences during the Construction Phase of the Project. Where PM chairs <br />the meetings, PM shall prepare agendas and keep meeting minutes. Where <br />others chair the meetings, PM shall ensure that agendas and meeting minutes <br />are obtained. Minutes shall be provided within two (2) working days of the <br />meeting. <br />REV: 08-21-19 PR <br />
The URL can be used to link to this page
Your browser does not support the video tag.