Laserfiche WebLink
PM's responsibilities hereunder shall be limited to defective or deficient work of <br />an apparent and patent nature. <br />3.10 Site Safety <br />3.10.1 CITY Safety Program. Prior to any performance of work at the site, the PM shall <br />review the safety requirements for the Project and verify that the Contractor <br />implements a safety program during construction, whenever Contractor <br />personnel is onsite, and for public safety. <br />3.10.2 Contractor Safety Programs. PM shall review safety programs of the Contractor <br />for conformity with requirements of the construction documents and applicable <br />law; PM shall monitor the Contractor's compliance with their respective safety <br />programs and immediately advise the Contractor of deficiencies. PM shall <br />document non-conformance in the daily report. If Contractor does not comply <br />within a reasonable timeframe to ensure safety, PM shall advise the CITY of <br />measures, if any, necessary or appropriate to obtain the Contractor's <br />compliance. <br />By undertaking the obligations hereunder, PM shall not be deemed to have <br />assumed responsibility for the adequacy or sufficiency of safety programs <br />implemented by Contractor, but the PM is responsible for verifying that the <br />Contractor has established a safety program, that the safety program established <br />by the Contractor is in compliance with the construction documents and <br />applicable law, rule or regulation and that the Contractor implements its safety <br />program during construction of the Project. <br />3.10.3 Safety Violations; Safety Conditions. The PM shall promptly notify and document <br />to the CITY in writing of all PM observed instances of the Contractor(s) failure to <br />comply with applicable safety requirements or safety programs. In the event of a <br />safety violation or other unsafe conditions on or about the site of the Project <br />which have immediate potential or actual adverse effect on life or property, the <br />PM is authorized, without prior notice to CITY or prior directive of the CITY, to <br />take all actions deemed necessary and appropriate by the PM under the then <br />existing circumstances to prevent such actual or potential adverse effect. <br />3.11 Changes and Claims. <br />3.11.1 Coordination of Changes. PM will coordinate and disseminate correspondence, <br />drawings and other written materials by and between the Contractor(s), the CITY, <br />testing/ inspection service providers and the Architect relating to changes to the <br />work of the Project. PM will coordinate: <br />(i) the Architect's preparation of modifications to the design documents as <br />necessaryforthe Contractor to implement a CITY authorized change; <br />REV: 08-21-19 PR <br />