My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-10-14 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-10-14 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:23:40 PM
Creation date
10/10/2019 5:36:08 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.D. - Page 25 of 38 <br />Expectations <br />A. Parts and Materials <br />Contractor is expected to maintain an inventory of common parts and materials needed <br />to maintain the City's water pumps and motors. Contractor must have materials needed <br />for preventative maintenance available at all times. <br />Please describe in the Proposal, Contractor's ability and average timelines for obtaining <br />parts and materials. <br />B. Staffing <br />Skilled and competent workers shall perform all work in a timely, neat, and orderly <br />manner. City may refuse to accept work or workers who do not meet these standards. <br />Contractor shall be responsible for any damage caused by their operations and shall repair <br />or replace, as directed by the City, said damage within a reasonable time. <br />The Contractor shall also maintain and provide direct phone numbers, cellular phone <br />numbers, and email addresses of key staff with whom the City can maintain regular and <br />direct contact regarding scheduling, billing, status reports, and other items. <br />C. Contractor's Shop <br />The Contractor shall have or establish adequate shop and storage facilities. Contractor's <br />facility shall house the necessary equipment and materials for repair and maintenance of <br />the City's water pumps. <br />D. Contractor's Equipment <br />The Contractor is responsible for having all equipment necessary to perform the work <br />described in Attachment A — Scope of Services. Contractor's staff must be experienced <br />and capable of operating such equipment, and Contractor must maintain Contractor's <br />equipment in good working order. <br />E. City's Right to Inspect and Require Work <br />The City of Redwood City reserves the right to make such inspections whenever necessary <br />to ascertain that the requirements of this agreement are being fulfilled. Deficiencies <br />noted shall be promptly corrected at Contractor's expense. <br />Notwithstanding the separate Liquidated Damages clause, if Contractor fails to perform <br />the work required by the terms of the agreement in a diligent and satisfactory manner, <br />the City may, after 30 days' written notice to Contractor, perform or cause to be <br />performed, all or any part of the work required hereunder. Contractor agrees that it will <br />reimburse the City, and the City may deduct the amount from any sum owed Contractor. <br />The waiver by the City of a breach of any provision of this agreement by Contractor shall <br />not operate or be construed as a waiver of any subsequent breach by Contractor. <br />PUBLIC WORKS SERVICES DEPARTMENT <br />FY2018-19 WATER PUMP PM AND ON-CALL REPAIR RFP <br />13 of 25 <br />152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.