My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res12 15217
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res12 15217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:47:45 AM
Creation date
10/11/2019 7:47:39 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYINGTHE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT; ADOPTING CEQA FINDINGS, AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/10/2012 <br /> substantially alter the existing drainage pattern of the site in a manner that could <br /> result in substantial erosion or siltation on or off site. <br /> Mitigation: MM HYD—6: The project shall install a stormwater treatment system so that runoff <br /> would be filtered over a minimum of twenty-five(25)feet of vegetation or through <br /> other equivalent means and will not degrade water quality before discharging into the <br /> City storm drain system and eventually Cordilleras Creek. Prior to recordation of the <br /> final map,the applicant shall enter into an Operation and Maintenance Agreement, <br /> and provide a maintenance plan, with the City to ensure the ongoing operation and <br /> maintenance of treatment controls for the on-site drainage system. <br /> Finding: Implementation of MM HYD—6 would reduce the project's impact on water quality <br /> post-construction to a less than significant level. <br /> Facts in Support of Finding: Implementation of MM HYD—6 would reduce the project's impact <br /> on water quality post-construction by complying with the NPDES permit that <br /> requires treatment measures to be incorporated into the project to reduce <br /> contaminants in surface runoff as described in Section 2.2—Hydrology and Water <br /> Quality of the Draft EIR on pages 50-63, which is hereby incorporated by reference. <br /> Noise <br /> Impact: Impact NOI—1: Noise generating activities associated with demolition and <br /> construction at the project site would temporarily elevate noise levels in the area <br /> surrounding the project site. <br /> Mitigation: MM NOI—1: The project shall implement the following measures to reduce the <br /> duration and volume of construction noise: <br /> a. Limit construction to daytime hours(7:00 AM to 8:00 PM) Monday through <br /> Friday, with no construction activities on weekends or holidays per Section <br /> 24.32 of the City of Redwood City Municipal Code. <br /> b. Construction activities or equipment shall not generate noise levels exceeding <br /> ll 0 dB(A)per Sec. 24.31 of the City of Redwood City Municipal Code. <br /> c. Utilize"quiet"models of air compressors and other stationary noise sources <br /> where technology exists. <br /> d. Prohibit unnecessary idling of internal combustion engine. <br /> 14 <br /> RESO.#15217 <br /> MUFF#613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.