My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> intersection would improve to an <br /> acceptable LOS D in the PM peak hour, <br /> resulting in a less-than-significantimpact. <br /> However,because this improvement would <br /> require Caltrans approval,the City cannot <br /> ensure the construction of this <br /> improvement. Without implementation of <br /> the proposed mitigation,the impact would <br /> be si nificant and unavoidable. <br /> Impact 7-3: Existing Plus Project Impact Mitigation 7-3. To mitigate the projecYs Applicant to fully fund. City Prior to building <br /> on Charter Street/Broadway Intersection. impact(i.e.,the project applicant would be Applicant or City to permit issuance that <br /> Under Existing Plus Project conditions during responsible for fully funding/completing the construct. would result in <br /> the AM peak hour,project traffic would cause mitigation)at the intersection of Charter 576,808 total square <br /> the intersection to degrade from LOS B(14.1 Street and Broadway,the intersection feet in Precise Plan <br /> seconds delay)to LOS F(117.1 seconds would need to be signalized with protected Blocks A-E. Refer to <br /> delay). In the PM peak hour,project traffic phasing on all approaches. The Stanford Precise <br /> would cause the intersection to degrade from northbound and southbound approaches Plan, Chapter IV, <br /> LOS C(17.9 seconds delay)to LOS F(122.5 on Charter Street would need to be Intersection <br /> seconds delay). In addition,this intersection restriped to include a total of one left-turn Improvements Table. <br /> would have peak hour volumes large enough lane and one shared through/right-turn <br /> under both peak hours to satisfy the peak lane. The eastbound and westbound <br /> hour signal warrant. According to City approaches on Broadway would need to be <br /> guidelines,these changes would constitute a restriped to include a total of one left-turn, <br /> signii►cant project impact. one through lane,and one shared <br /> through/right-turn lane. Parking(50 <br /> spaces)would need to be removed from all <br /> intersection legs to accommodate travel <br /> lanes. With these improvements,the level <br /> of service(LOS)at this intersection would <br /> improve to an acceptable LOS B in the AM <br /> peak hour and an acceptable LOS C in the <br /> PM peak hour,and the impact would be <br /> less-than-signii►cant. <br /> Impact 7�: Existing Plus Project Impact Mitigation 7�. To mitigate the projecYs Applicant to fully fund. City Prior to building <br /> on Douglas Avenue/Broadway impact(i.e.,the project applicant would be Applicant or City to permit issuance that <br /> Intersection. Under Existing Plus Project responsible for fully funding/completing the construct. would result in <br /> conditions during the AM peak hour, project mitigation)at the intersection of Douglas 560,712 total square <br /> traffic would cause the intersection to Avenue and Broadway,the intersection feet in Precise Plan <br /> degrade from LOS B(10.4 seconds delay)to would need to be signalized with protected Blocks A-E. Refer to <br /> LOS F(167.6 seconds). During the PM peak phasing on all approaches. (Douglas Stanford Precise <br /> hour,project traffic would cause the Avenue is considered north-south and Plan, Chapter IV, <br /> intersection to degrade from LOS B(11.1 Broadway is considered east-west.) In Intersection <br /> seconds)to LOS F(180.0 seconds). In addition to signalization, parking(15 Improvements Table. <br /> addition,this intersection would have peak spaces)would need to be removed from <br /> hour volumes large enough under both peak the north and south legs to accommodate <br /> hours to satisfy the peak hour signal warrant. additional travel lanes. The southbound <br /> Accordin to Cit uidelines,these chan es approach would need to be restriped to <br /> Page 3 `� r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.