My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> would constitute a signii►cant project include a total of one left-turn lane,one <br /> impact. through lane,and one right-turn lane. The <br /> northbound approach would need to be <br /> restriped to include a total of two <br /> northbound left-turn lanes and one shared <br /> through/right-turn lane. The eastbound and <br /> westbound approaches would need to be <br /> restriped to include a total of one left-turn <br /> lane and one shared through/right-turn <br /> lane. With these improvements,the level <br /> of service(LOS)at this intersection would <br /> improve to an acceptable LOS C during <br /> both peak hours,and the impact would be <br /> less-than-signii►cant. <br /> Impact 7-5: Near Term Plus Project Mitigation 7-5. Implement Mitigation 7-1 Applicant to fully fund. City Prior to building <br /> Impact on Woodside Road/Broadway (the project applicant would be responsible Applicant or City to permit issuance that <br /> Intersection. Under Near Term Plus Project for fully funding/completing the mitigation). construct. would result in <br /> conditions during the PM peak hour,this With these improvements,the level of 608,999 total square <br /> intersection would continue to operate at LOS service(LOS)at this intersection would feet in Precise Plan <br /> F,and project traffic would cause the critical remain at LOS F. Although the LOS F Blocks A-E. Refer to <br /> delay to increase by 69.5 seconds. condition would exceed the City LOS Stanford Precise <br /> According to City of Redwood City guidelines, standard,the LOS under Near Term Plus Plan, Chapter IV, <br /> this change would constitute a signii►cant Project condition with this mitigation would Intersection <br /> project impact. be better than that under the Near Term Improvements Table. <br /> Without Project condition. These <br /> improvements would enhance the overall <br /> performance of the intersection. Therefore, <br /> with this mitigation,this project impact <br /> would be considered less-than-significant. <br /> However,because implementation of this <br /> mitigation would require Caltrans approval, <br /> the City cannot ensure its construction. <br /> Without implementation of the proposed <br /> mitigation,the impact would be signii►cant <br /> and unavoidable. <br /> Impact 7-6: Near Term Plus Project Mitigation 7-6. Implement Mitigation 7-2 Applicant to fully fund. City Prior to building <br /> Impact on Woodside Road/Bay Road (the project applicant would be responsible Applicant or City to permit issuance that <br /> Intersection. Under Near Term Plus Project for fully funding/completing the mitigation). construct. would result in <br /> conditions during the PM peak hour, project With these improvements,the level of 849,155 total square <br /> traffic would cause this intersection to service(LOS)at this intersection would feet in Precise Plan <br /> degrade from LOS D(44.9 seconds delay)to improve to an acceptable LOS D in the PM Blocks A-E. Refer to <br /> LOS F(91.1 seconds delay). According to peak hour,resulting in a less-than- Stanford Precise <br /> City guidelines,this change would constitute significantimpact. However, because Plan, Chapter IV, <br /> a signii►cant project impact. implementation of this mitigation would Intersection <br /> require Caltrans approval,the City cannot Improvements Table. <br /> ensure its construction. Without <br /> im lementation of the ro osed miti ation, <br /> Page 4 ' r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.