My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> the impact would be signii►cant and <br /> unavoidable. <br /> Impact 7-7: Near Term Plus Project Mitigation 7-7. Implement Mitigation 7-3 Applicant to fully fund. City Prior to building <br /> Impact on Charter Street/Broadway (the project applicant would be responsible Applicant or City to permit issuance that <br /> Intersection. Under Near Term Plus Project for fully funding/completing the mitigation). construct. would result in <br /> conditions during the AM peak hour, project With these improvements,the level of 576,808 total square <br /> traffic would cause this intersection to service(LOS)at this intersection would feet in Precise Plan <br /> degrade from LOS C(24.7 seconds delay)to improve to an acceptable LOS B in the AM Blocks A-E. Refer to <br /> LOS F(127.7 seconds delay). In the PM peak hour and an acceptable LOS C in the Stanford Precise <br /> peak hour,the intersection would continue to PM peak hour,and the impact would be Plan, Chapter IV, <br /> operate at LOS F,and project traffic would less-than-signii►cant. Intersection <br /> cause the critical delay at the intersection to Improvements Table. <br /> increase by 104.6 seconds. In addition,the <br /> increase in peak hour volumes at this <br /> intersection would be large enough under <br /> both peak hours to satisfy the peak hour <br /> signal warrant. According to City guidelines, <br /> these changes would constitute a signii►cant <br /> ro"ectim act. <br /> Impact 7-8: Near Term Plus Project Mitigation 7-8(a). To mitigate the projecYs Applicant fair share or City Prior to building <br /> Impact on Charter Street/Bay Road impact at the intersection of Charter Street payment of Traffic permit issuance that <br /> Intersection. Under Near Term Plus Project and Bay Road,the intersection would need Impact Fee would result in <br /> conditions during the PM peak hour, project to be signalized with protected phasing on 1,370,785 total <br /> traffic would cause the intersection to the eastbound and westbound approaches square feet in <br /> degrade from LOS D(27.7 seconds delay)to on Bay Road,and permitted phasing on the Precise Plan Blocks <br /> LOS E(37.7 seconds delay). In addition,this northbound and southbound approaches A-E. Refer to <br /> intersection would have peak hour volume on Charter Street. In addition to Stanford Precise <br /> increases large enough under both peak signalization,the eastbound and Plan, Chapter IV, <br /> hours to satisfy the peak hour signal warrant. westbound approaches would need to be Intersection <br /> According to City guidelines,these changes restriped to include a total of one left-turn Improvements Table. <br /> would constitute a signii►cant project lane and one shared through/right-turn <br /> impact. lane. With these improvements,the level If,at the time this <br /> of service(LOS)at this intersection would improvement is <br /> improve to an acceptable LOS C in the AM required,the <br /> peak hour and LOS D in the PM peak hour. improvement has not <br /> Traffic from the proposed project would add yet been constructed <br /> 10.0 seconds to the PM peak hour delay at and the City <br /> this intersection over Near Term No Project determines that other <br /> conditions(see EIR Table 7.11);other Near development has not <br /> Term growth would add 14.5 seconds to yet significantly <br /> the delay over Existing conditions. contributed to the <br /> need for the <br /> Therefore, it is assumed that the proposed improvement,then <br /> project would contribute approximately 41 the applicant shall <br /> percent toward this impact. The proposed fully fund or construct <br /> project would mitigate its contribution to the improvement, <br /> this impact by contributing its fair share to a subject to potential <br /> Page 5 `� r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.