My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> mitigation fund established to pay for the reimbursement for <br /> cost of this improvement(estimated,based improvement costs <br /> on this EIR,to be 41 percent)at the time of that exceed the <br /> issuance of a building permit or,if the City applicanYs fair share. <br /> adds the improvement to its Traffic Impact Refer to Precise <br /> Fee Program(TIF)project list,the Plan, Chapter III, <br /> proposed project would mitigate its Capital <br /> contribution to this impact by paying its Improvements. <br /> Traffic Impact Fee in effect at time of <br /> payment and issuance of a building permit. <br /> ApplicanYs full funding or construction of <br /> the improvement,subject to potential <br /> reimbursement as provided in the Precise <br /> Plan,would also mitigate the projecYs <br /> contribution to this impact. <br /> or <br /> Mitigation 7-8(b). Mitigation of the Applicant fair share or City Prior to building <br /> projecYs impact at the intersection of payment of Traffic permit issuance that <br /> Charter Street and Bay Road would require Impact Fee would result in <br /> the conversion of the all-way stop 1,370,785 total <br /> controlled unsignalized intersection to a square feet in <br /> single-lane roundabout. Standard Precise Plan Blocks <br /> roundabouts are at least 110 feet in A-E. Refer to <br /> diameter. Smaller roundabouts may Stanford Precise <br /> operate efficiently down to 80 feet in Plan, Chapter IV, <br /> diameter. The existing intersection at Intersection <br /> Charter Street and Bay Road would allow Improvements Table. <br /> up to an 80-foot-diameter roundabout. If <br /> the design work shows that the 80-foot- If,at the time this <br /> diameter roundabout would not require the improvement is <br /> acquisition of additional right-of-way and required,the <br /> would not create additional safety hazards improvement has not <br /> for motorists, pedestrians,or bicyclists yet been constructed <br /> compared to Mitigation 7-8(a),and if and the City <br /> substantial evidence at the time the determines that other <br /> roundabout is proposed shows that the development has not <br /> roundabout would not divert traffic to other yet significantly <br /> intersections,the roundabout shall be contributed to the <br /> considered feasible and may be substituted need for the <br /> for Mitigation 7-8(a). With this improvement,then <br /> improvement,the level of service(LOS)at the applicant shall <br /> this intersection would improve to an fully fund or construct <br /> acceptable LOS B during the AM peak hour the improvement, <br /> and LOS C during the PM peak hour. subject to potential <br /> Page 6 v r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.