Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> Traffic from the proposed project would add reimbursement for <br /> 10.0 seconds to the PM peak hour delay at improvement costs <br /> this intersection over Near Term No Project that exceed the <br /> conditions(see EIR Table 7.11);other Near applicanYs fair share. <br /> Term growth would add 14.5 seconds to Refer to Precise <br /> the delay over Existing conditions. Plan, Chapter III, <br /> Therefore, it is assumed that the proposed Capital <br /> project would contribute approximately 41 Improvements. <br /> percent toward this impact. The proposed <br /> project would mitigate its contribution to <br /> this impact by contributing its fair share to a <br /> mitigation fund established to pay for the <br /> cost of this improvement(estimated,based <br /> on this EIR,to be 41 percent)at the time of <br /> issuance of a building permit or,if the City <br /> adds the roundabout to its Traffic Impact <br /> Fee Program(TIF)project list,the <br /> proposed project would mitigate its <br /> contribution to this impact by paying its <br /> Traffic Impact Fee in effect at time of <br /> payment and issuance of a building permit. <br /> ApplicanYs full funding or construction of <br /> the improvement,subject to potential <br /> reimbursement as provided in the Precise <br /> Plan,would also mitigate the projecYs <br /> contribution to this impact. <br /> Implementation of any one of these two <br /> mitigation options would reduce this project <br /> im act to a less-than-si nii►cant level. <br /> Impact 7-9: Near Term Plus Project Mitigation 7-9. Implement Mitigation 7-4 Applicant to fully fund. City Prior to building <br /> Impact on Douglas Avenue/Broadway (the project applicant would be responsible Applicant or City to permit issuance that <br /> Intersection. Under Near Term Plus Project for fully funding/completing the mitigation). construct. would result in <br /> conditions during the AM peak hour, project With these improvements,the level of 560,712 total square <br /> traffic would cause the intersection to service(LOS)at this intersection would feet in Precise Plan <br /> degrade from LOS C(21.9 seconds)to LOS improve to an acceptable LOS C during Blocks A-E. Refer to <br /> F(179.1 seconds). During the PM peak both peak hours,and the impact would be Stanford Precise <br /> hour,the intersection would continue to less-than-signii►cant. Plan, Chapter IV, <br /> operate at LOS F, but project traffic would Intersection <br /> cause the critical delay at the intersection to Improvements Table. <br /> increase from 54.5 seconds to 223.4 seconds <br /> (i.e.,by 168.9 seconds). In addition,this <br /> intersection would have peak hour volume <br /> increases large enough under both peak <br /> hours to satisfy the peak hour signal warrant. <br /> According to City guidelines,these changes <br /> constitute a signii►cant project impact. <br /> Page 7 � r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />