My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> Impact 7-10: Near Term Plus Project Mitigation 7-10(a). The signalization of the Applicant fair share or City Prior to building <br /> Impact on 5th Avenue/Bay Road 5th Avenue/Bay Road intersection is a payment of Traffic permit issuance that <br /> Intersection. Under Near Term Plus Project transportation project included in the City's Impact Fee would result in <br /> conditions during the PM peak hour, project 2000 Traffic Impact Fee Program(TIF). 1,370,785 total <br /> traffic would cause the intersection to Payment by the project applicant of its City square feet in <br /> degrade from LOS C(21.8 seconds delay)to Traffic Impact Fee in effect at time of Precise Plan Blocks <br /> LOS E(38.4 seconds delay). In addition,this payment and issuance of a building permit A-E. Refer to <br /> intersection would have peak hour volume (or alternatively applicanYs full funding or Stanford Precise <br /> increases large enough under both peak construction of the improvement subject to Plan, Chapter IV, <br /> hours to satisfy the peak hour signal warrant. potential reimbursement as provided in the Intersection <br /> According to City guidelines,these changes Precise Plan)would mitigate this impact. Improvements Table. <br /> would constitute a signii►cant project To mitigate the projecYs impact at the <br /> impact. intersection of 5th Avenue and Bay Road, If,at the time this <br /> the intersection would need to be improvement is <br /> signalized. (5th Avenue is considered required,the <br /> north-south and Bay Road is considered improvement has not <br /> east-west.) No further improvements would yet been constructed <br /> be required. With this improvement,the and the City <br /> level of service(LOS)at this intersection determines that other <br /> would improve to an acceptable LOS B development has not <br /> during both peak hours. yet significantly <br /> contributed to the <br /> or need for the <br /> improvement,then <br /> the applicant shall <br /> fully fund or construct <br /> the improvement, <br /> subject to potential <br /> reimbursement for <br /> improvement costs <br /> that exceed the <br /> applicanYs fair share. <br /> Refer to Precise <br /> Plan, Chapter III, <br /> Capital <br /> Improvements. <br /> Mitigation 7-10(b). Mitigation of the Applicant fair share or City Prior to building <br /> projecYs impact at the intersection of 5th payment of Traffic permit issuance that <br /> Avenue and Bay Road would require the Impact Fee would result in <br /> conversion of the all-way stop controlled 1,370,785 total <br /> intersection to a single lane roundabout. square feet in <br /> The existing road widths at 5th Avenue and Precise Plan Blocks <br /> Bay Road would allow up to an 85-foot- A-E. Refer to <br /> diameter roundabout. If the design work Stanford Precise <br /> shows that the 85-foot-diameter Plan, Chapter IV, <br /> roundabout would not require the Intersection <br /> acquisition of additional right-of-way and Improvements Table. <br /> Page 8 `� r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.