My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> would not create additional safety hazards If,at the time this <br /> for motorists, pedestrians,or bicyclists improvement is <br /> compared to Mitigation 7-10(a),and if required,the <br /> substantial evidence at the time the improvement has not <br /> roundabout is proposed shows that the yet been constructed <br /> roundabout would not divert traffic to other and the City <br /> intersections,the roundabout shall be determines that other <br /> considered feasible and may be substituted development has not <br /> for Mitigation 7-10(a). With this yet significantly <br /> improvement,the level of service(LOS)at contributed to the <br /> this intersection would improve to an need for the <br /> acceptable LOS A during both peak hours. improvement,then <br /> the applicant shall <br /> Implementation of either one of these two fully fund or construct <br /> mitigation options would reduce this project the improvement, <br /> impact to a less-than-signii►cant level. subject to potential <br /> reimbursement for <br /> improvement costs <br /> that exceed the <br /> applicanYs fair share. <br /> Refer to Precise <br /> Plan, Chapter III, <br /> Capital <br /> Im rovements. <br /> Impact 7-12: Cumulative With Project Mitigation 7-12. To mitigate the projecYs Applicant fair share or City to monitor in Prior to building <br /> Impact on Veterans Boulevard/Woodside contribution to the cumulative impact at the payment of Traffic consultation with permit issuance that <br /> Road Intersection. Under Cumulative With intersection of Veterans Boulevard and Impact Fee C/CAG&Caltrans would result in <br /> Project conditions during the PM peak hour, Woodside Road,an additional eastbound 715,189 total square <br /> the intersection would remain at LOS F and through lane would need to be added. feet in Precise Plan <br /> the proposed project could contribute up to (Woodside Road is considered north-south Blocks A-E. Refer to <br /> 22.8 seconds of critical delay to the and Veterans Boulevard is considered Stanford Precise <br /> intersection. According to City of Redwood east-west.) With these improvements,the Plan, Chapter IV, <br /> City guidelines,this constitutes a level of service(LOS)at this intersection Intersection <br /> cumulatively considerable contribution to would improve to LOS E during the PM Improvements Table. <br /> a signii►cant cumulative impact. peak hour.Although LOS E still exceeds <br /> the City of Redwood City LOS standard, <br /> the LOS under Cumulative With Project <br /> conditions would be better than that under <br /> Cumulative No Project conditions. <br /> Therefore,with this mitigation,the projecYs <br /> contribution to this cumulative impact would <br /> be considered less-than-significant. <br /> Widening of Veterans Boulevard between <br /> Chestnut and Woodside Road is included <br /> in the City's Traffic Impact Fee Program <br /> (TIF)project list. Accordingly,the <br /> applicanYs payment of its Traffic Impact <br /> Fee in effect at time of a ment and <br /> Page 9 v r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.