My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:59:20 AM
Creation date
10/11/2019 7:59:12 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Description
A RESOLUTION OF THE CITY COUNCIL CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 1548 MAPLE STREET PROJECT; ADOPTING CEQA FINDINGS; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Construct exterior walls with a minimum STC rating of STC -46. <br />Install vent ducts connecting interior spaces to the exterior (i.e., bathroom exhaust, <br />etc.) with at least two 90 degree turns in the duct. <br />Install windows and doors in an acoustically -effective manner. Install sliding -window <br />panels with an air -tight seal when in the closed position and the window frames <br />caulked to the wall opening around the perimeter with a non -hardening caulking <br />compound to prevent sound infiltration. Install exterior doors with an air -tight seal <br />around the full perimeter when in the closed position. <br />Finding: Implementation of Mitigation Measure NOW would reduce potential <br />impacts related to an unacceptable noise environment for residential land uses to a less - <br />than -significant level. <br />Facts in Support of Finding: This mitigation measure appropriately identifies <br />measures to reduce interior noise that are consistent with best management practices <br />during operation. Implementation of these measures would reduce interior noise to <br />acceptable levels established by the City. <br />Impact N0I-2: Noise from construction activities would result in a substantial <br />temporary or periodic increase in ambient noise levels in the project vicinity above levels <br />existing without the project. <br />Mitigation N0I-2: The project contractor shall implement the following measures <br />during construction of the proposed project: <br />Equip all construction equipment, fixed or mobile, with properly operating and <br />maintained mufflers consistent with manufacturers' standards. <br />Place all stationary construction equipment so that emitted noise is directed away <br />from sensitive receptors nearest the active project site. <br />Locate equipment staging in areas that would create the greatest possible distance <br />between construction -related noise sources and noise -sensitive receptors nearest <br />the active project site during all project construction. <br />Ensure that all general construction related activities are restricted to between the <br />hours of 7:00 a.m. and 8:00 p.m. on weekdays. No construction shall be permitted on <br />weekends or holidays. <br />Post a sign at all entrances to the work site prior to commencement of the work for <br />the purpose of informing all contractors and subcontractors and all other persons at <br />the property of the basic limitations upon noise and construction activities provided in <br />the noise ordinance. <br />Designate a "disturbance coordinator" at the City of Redwood City who would be <br />responsible for responding to any local complaints about construction noise. The <br />disturbance coordinator would determine the cause of the noise complaint (e.g., <br />starting too early, bad muffler) and would determine and implement reasonable <br />measures warranted to correct the problem. <br />ATTY/RESO.0035/CC RESO CERTIFYING FINAL EIR —1548 MAPLE RESO. NO. 15661 <br />REV: 04-30-18 PR MUFF NO. 601 <br />Page 14 of 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.