Laserfiche WebLink
Construct exterior walls with a minimum STC rating of STC -46. <br />Install vent ducts connecting interior spaces to the exterior (i.e., bathroom exhaust, <br />etc.) with at least two 90 degree turns in the duct. <br />Install windows and doors in an acoustically -effective manner. Install sliding -window <br />panels with an air -tight seal when in the closed position and the window frames <br />caulked to the wall opening around the perimeter with a non -hardening caulking <br />compound to prevent sound infiltration. Install exterior doors with an air -tight seal <br />around the full perimeter when in the closed position. <br />Finding: Implementation of Mitigation Measure NOW would reduce potential <br />impacts related to an unacceptable noise environment for residential land uses to a less - <br />than -significant level. <br />Facts in Support of Finding: This mitigation measure appropriately identifies <br />measures to reduce interior noise that are consistent with best management practices <br />during operation. Implementation of these measures would reduce interior noise to <br />acceptable levels established by the City. <br />Impact N0I-2: Noise from construction activities would result in a substantial <br />temporary or periodic increase in ambient noise levels in the project vicinity above levels <br />existing without the project. <br />Mitigation N0I-2: The project contractor shall implement the following measures <br />during construction of the proposed project: <br />Equip all construction equipment, fixed or mobile, with properly operating and <br />maintained mufflers consistent with manufacturers' standards. <br />Place all stationary construction equipment so that emitted noise is directed away <br />from sensitive receptors nearest the active project site. <br />Locate equipment staging in areas that would create the greatest possible distance <br />between construction -related noise sources and noise -sensitive receptors nearest <br />the active project site during all project construction. <br />Ensure that all general construction related activities are restricted to between the <br />hours of 7:00 a.m. and 8:00 p.m. on weekdays. No construction shall be permitted on <br />weekends or holidays. <br />Post a sign at all entrances to the work site prior to commencement of the work for <br />the purpose of informing all contractors and subcontractors and all other persons at <br />the property of the basic limitations upon noise and construction activities provided in <br />the noise ordinance. <br />Designate a "disturbance coordinator" at the City of Redwood City who would be <br />responsible for responding to any local complaints about construction noise. The <br />disturbance coordinator would determine the cause of the noise complaint (e.g., <br />starting too early, bad muffler) and would determine and implement reasonable <br />measures warranted to correct the problem. <br />ATTY/RESO.0035/CC RESO CERTIFYING FINAL EIR —1548 MAPLE RESO. NO. 15661 <br />REV: 04-30-18 PR MUFF NO. 601 <br />Page 14 of 49 <br />