LSA ASSOCIATES, INC. <br />APRIL 2018 <br />Table 1: Mitigation Monitoring and Reporting Prq;rarn <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />E. AIR QUALITY <br />AIR -l: Construction of the <br />AIR -1: Consistent with guidance from the BAAQMD, the During all phases Project Applicant <br />Timeframe for <br />Responsibility for Oversight of <br />Impact <br />Mitigation Measures <br />Implementation <br />Implementation Implementation <br />TRA -4: Development of the <br />TRA -4: The existing right-of-way shall be restriped to add <br />Prior to issuance <br />Project Applicant Redwood City <br />proposed project and the project <br />a second westbound left turn pocket on East Bayshore Road <br />of building <br />Community <br />variant, combined with <br />and to extend the existing turn pockets. This modification is <br />permits <br />Development <br />cumulative development in the <br />included in the TIF project list. The project applicant shall <br />• All haul trucks transporting soil, sand, or other loose <br />Director <br />defined geographic area, <br />contribute its fair share to this improvement. Concurrent <br />including past, present, existing, <br />with future building permit applications, the City shall <br />roads shall be removed using wet power vacuum street <br />approved, pending, and <br />ensure that the required transportation impact mitigation fee <br />sweepers at least once per day. The use of dry power <br />reasonably foreseeable future <br />has been submitted. <br />development, would contribute <br />15 mph. <br />a considerable amount of traffic <br />• All roadways, driveways, and sidewalks to be paved <br />to Blomquist Street/Seaport <br />shall be completed as soon as possible. Building pads <br />Boulevard/East Bayshore Road <br />seeding or soil binders are used. <br />(Intersection #8) and increase <br />the delay by more than the five <br />seconds in the PM peak hour. <br />E. AIR QUALITY <br />AIR -l: Construction of the <br />AIR -1: Consistent with guidance from the BAAQMD, the During all phases Project Applicant <br />Redwood City <br />proposed project and the project <br />project contractor shall ensure the following Basic of construction <br />Community <br />variant would generate air <br />Construction Mitigation Measures are implemented through Construction <br />Development <br />pollutant emissions that could <br />all construction contracts and specifications for the project: Contractor <br />Director <br />violate air quality standards. <br />• All exposed surfaces (e.g., parking areas, staging areas, <br />soil piles, graded areas, and unpaved access roads) shall <br />be watered two times per day. <br />• All haul trucks transporting soil, sand, or other loose <br />material off-site shall be covered. <br />• All visible mud or dirt tracked -out onto adjacent public <br />roads shall be removed using wet power vacuum street <br />sweepers at least once per day. The use of dry power <br />sweeping is prohibited. <br />• All vehicle speeds on unpaved roads shall be limited to <br />15 mph. <br />• All roadways, driveways, and sidewalks to be paved <br />shall be completed as soon as possible. Building pads <br />shall be laid as soon as possible after grading unless <br />seeding or soil binders are used. <br />ATTY/RE50.0035/CC RESO CERTIFYING FINAL EIR-1548 MAPLE <br />REV: 04-30-18 PR <br />Page 36 of 49 <br />RESO. NO. 15661 <br />MUFF NO. 601 <br />