Laserfiche WebLink
LSA ASSOCIATES, INC. <br />APRIL 2018 <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Table 1: Mitigation Monitoring and Reporting Program <br />Timeframe for <br />Impact <br />Mitigation Measures <br />Implementation <br />AIR -1 Continued <br />Idling times shall be minimized either by shutting <br />equipment off when not in use or reducing the <br />maximum idling time to 5 minutes (as required by the <br />California airborne toxics control measure Title 13, <br />Section 2485 of California Code of Regulations [CCR]). <br />Clear signage shall be provided for construction <br />workers at all access points. <br />All construction equipment shall be maintained and <br />properly tuned in accordance with manufacturer's <br />specifications. All equipment shall be checked by a <br />certified mechanic and determined to be running in <br />proper condition prior to operation. <br />A publicly visible sign shall be posted with the <br />telephone number and person to contact at the City of <br />Redwood City regarding dust complaints. This person <br />shall respond and take corrective action within 48 hours. <br />The BAAQMD phone number shall also be visible to <br />ensure compliance with applicable regulations. <br />AIR -2: Operation of the <br />AIR -2: The following measures shall be implemented by <br />Prior to issuance <br />proposed project would expose <br />the project applicant and approved by the City through the <br />of building <br />future residents of the project <br />final design process to reduce TACs and particulate matter <br />permits <br />site to toxic air contaminants. <br />indoors to a level sufficient to achieve compliance with <br />BAAQMD health risk thresholds: <br />• The project applicant shall provide an HVAC system <br />with a control efficiency sufficient to result in a <br />reduction of a minimum 80.0 percent of particulates of <br />2.5 microns or less, such as Minimum Efficiency <br />Reporting Value (MERV)-13 filters or greater, for <br />indoor air filtration systems . The ventilation system <br />shall be certified to achieve the stated performance <br />effectiveness from indoor areas. <br />I • The project applicant shall locate all air intakes as far— <br />— <br />away from US 101 as feasible. <br />ATTY/RESO.0035/CC RE50 CERTIFYING FINAL EIR-1548 MAPLE <br />REV: 04-30-18 PR <br />Page 37 of 49 <br />RESO. NO. 15661 <br />MUFF NO. 601 <br />Responsibility for Oversight of <br />Implementation Implementation <br />Project Applicant <br />Redwood City <br />Community <br />Development <br />Director <br />