My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:59:20 AM
Creation date
10/11/2019 7:59:12 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Description
A RESOLUTION OF THE CITY COUNCIL CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 1548 MAPLE STREET PROJECT; ADOPTING CEQA FINDINGS; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />APRIL 2018 <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Table 1: Mitigation Monitoring and Reporting Program <br />Timeframe for <br />Impact <br />Mitigation Measures <br />Implementation <br />AIR -1 Continued <br />Idling times shall be minimized either by shutting <br />equipment off when not in use or reducing the <br />maximum idling time to 5 minutes (as required by the <br />California airborne toxics control measure Title 13, <br />Section 2485 of California Code of Regulations [CCR]). <br />Clear signage shall be provided for construction <br />workers at all access points. <br />All construction equipment shall be maintained and <br />properly tuned in accordance with manufacturer's <br />specifications. All equipment shall be checked by a <br />certified mechanic and determined to be running in <br />proper condition prior to operation. <br />A publicly visible sign shall be posted with the <br />telephone number and person to contact at the City of <br />Redwood City regarding dust complaints. This person <br />shall respond and take corrective action within 48 hours. <br />The BAAQMD phone number shall also be visible to <br />ensure compliance with applicable regulations. <br />AIR -2: Operation of the <br />AIR -2: The following measures shall be implemented by <br />Prior to issuance <br />proposed project would expose <br />the project applicant and approved by the City through the <br />of building <br />future residents of the project <br />final design process to reduce TACs and particulate matter <br />permits <br />site to toxic air contaminants. <br />indoors to a level sufficient to achieve compliance with <br />BAAQMD health risk thresholds: <br />• The project applicant shall provide an HVAC system <br />with a control efficiency sufficient to result in a <br />reduction of a minimum 80.0 percent of particulates of <br />2.5 microns or less, such as Minimum Efficiency <br />Reporting Value (MERV)-13 filters or greater, for <br />indoor air filtration systems . The ventilation system <br />shall be certified to achieve the stated performance <br />effectiveness from indoor areas. <br />I • The project applicant shall locate all air intakes as far— <br />— <br />away from US 101 as feasible. <br />ATTY/RESO.0035/CC RE50 CERTIFYING FINAL EIR-1548 MAPLE <br />REV: 04-30-18 PR <br />Page 37 of 49 <br />RESO. NO. 15661 <br />MUFF NO. 601 <br />Responsibility for Oversight of <br />Implementation Implementation <br />Project Applicant <br />Redwood City <br />Community <br />Development <br />Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.