My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15665
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res18 15665
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:59:29 AM
Creation date
10/11/2019 7:59:25 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/21/2018
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY DENYING THE APPEAL AND APPROVING A PLANNED COMMUNITY PERMIT, DENSITY BONUS INCLUIDNG A HEIGHT CONCESSION, AND AFFORDABLE HOUSING PLAN FOR 353 MAIN STREET PURSUANT TO THE CITY OF REDWOOD CITY'S NORTH MAIN STREET PRECISE PLAN, AND FINDING THAT SAID APPROVALS ARE EXEMPT FROM THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
httD://Dermits.redwoodcitv.oro [COA][PLANNING] <br />76. Construction Meetings — The applicant is required to contact the Permit <br />Counter (650.780.7350) to schedule the following meetings prior to or during <br />construction. [COA][BUILDING] <br />a. Pre -Submittal — Prior to building permit submittal, schedule a pre -submittal <br />meeting with Building, Planning, Engineering and Fire staff to discuss the <br />permitting process and submittal requirements. <br />b. Pre -Construction - After City permits are issued, but prior to start of <br />construction, schedule a pre -construction meeting with Engineering, <br />Building, Fire, and Planning staff to discuss the inspection process and <br />requirements for construction and site work. The applicant shall arrange for <br />the attendance of the owner, developer, construction manager, contractor, <br />and all subcontractors who are responsible for grading and erosion and <br />sedimentation protection controls. <br />C. Interior Finishes & Amenities - After sheetrock inspection but prior to <br />installation, contact the Project Planner and Housing Staff to verify, to the <br />City's satisfaction, that all interior finishes and amenities in the affordable <br />units are equivalent to amenities used in market rate units. <br />77. Materials Mock -Up — Prior to final foundation inspection, prepare a mock-up that <br />is outdoors, readily accessible, and will remain intact until the project has <br />reached substantial completion. The mock-up should include all project colors <br />and materials, windows for the base and top, balconies, lighting, and architectural <br />details, as well as construction details, such as the weep screed, to understand <br />how the design addresses them. Then schedule a mock-up meeting with the <br />Planning and Building Departments for final review and approval of the project <br />details. Submit an updated colors and materials board or details if any changes <br />are made as a result of the mock- up meeting. [COA][PLANNING] <br />78. Certification Letters - Prior to final inspection, submit certification letters from <br />the following architects verifying that the project, as constructed, complies with <br />approved plans. After the certification letter has been submitted, the project <br />planner will also confirm substantial compliance with the approved plans during <br />the scheduled final inspection. [COA][PLANNING]: <br />a. Project Landscape Architect verifying substantial conformance with the <br />approved landscape plan, including species, size, quantity, and location of <br />the approved trees, shrubs, and groundcover. It shall also verify landscape <br />lighting, fencing, irrigation, and other details as applicable. <br />b. Project Architect verifying substantial conformance with the approved <br />elevations, colors, materials, exterior light fixtures, and architectural details. <br />79. Construction Management and Staging - Prior to encroachment permit <br />ATTY/RESO.0041/CC RESO DENYING THE APPEAL FOR 353 MAIN STREET RESO NO. 15665 <br />REV: 05-14-18 PR MUFF NO. 603 <br />Page 22 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.