My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:37 AM
Creation date
10/11/2019 8:01:33 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/20/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING AN ARCHITECTURAL PERMIT, PLANNED DEVELOPMENT PERMIT, USE PERMIT, VESTING TENTATIVE MAP, STATE DENSITY BONUS LAW CONCESSIONS AND AN AFFORDABLE HOUSING PLAN FOR THE BROADWAY PLAZA PROJECT LOCATED AT 1401 BROADWAY AND 2201 BAY ROAD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05/20/2019 <br />Volumes Il & 111, CBC, and other State regulations. This shall be submitted as part of the building <br />permit application. [SDR] [ENGINEERING] <br />26. As-Builts -Provide "as -built" or "record" drawings, to be submitted in paper, PDF and AutoCAD <br />formats prior to project sign -off. [COA][ENGINEERING] <br />FEMA and Base Flood Elevations <br />27. Finished Floor Elevation (FFE) - The lowest finished floor elevation (FFE) is shown to be 9.7 <br />feet, based on NAVD88. FEMA has notified all the municipalities within San Mateo County that <br />new Flood Insurance Rate Maps (FIRMs) will become effective on April 5, 2019. The project <br />site is currently located within Zone X and is not within a Special Flood Hazard Area. Upon <br />FEMA's approval of the new maps, the project will be located within Zone AE, with a base flood <br />elevation of 10 feet, and will be within a Special Flood Hazard Area. Chapter 41 of the City's <br />municipal code and engineering standards require that new construction and substantial <br />improvements to existing structures be built with the lowest finished floor elevation set at or <br />above the base flood elevation, with a recommendation of setting the lowest finished floor <br />elevation 1 foot above the base flood elevation. Chapter 41 of the City's municipal code <br />requires that all building permits and project plans meet the requirements of the FIRM <br />in effect at the time of permit issuance, regardless of when the project was submitted or <br />deemed complete. [SDR][ENGINEERING] <br />28. Elevation Certificate - If all or a portion of the site is within a Special Flood Hazard Area (as <br />shown on the latest FEMA Flood Insurance Rate Maps in effect at building permit issuance), <br />upon completion of the structure, the elevation of the lowest floor (including basement when <br />applicable) shall be certified by a registered professional engineer or land surveyor, verified by <br />the City's Building Inspector to be properly elevated, and provided to the Floodplain <br />Administrator. Where required by Chapter 41 of the City's Municipal Code, the applicant shall <br />also submit certification by a registered professional engineer or architect that the standards <br />for elevation and floodproofing have been satisfied. [SDR][ENGINEERING] <br />Utility Infrastructure Improvements <br />29. Conformance with the City's Engineering Standards - All public improvements shall be <br />designed and constructed in accordance with the Cm's Engineering Standards. <br />[][ENGINEERING] <br />30. City Encroachment Permits - Obtain an Encroachment Permit from the Engineering and <br />Transportation Division for work listed below. This permit shall be obtained prior to the <br />commencement of construction of the road, utilities, or any site improvements. <br />[SDR][ENGINEERING] <br />a. Work in the City public right-of-way, easements or property in which the City holds <br />an interest. <br />b. Work requiring a grading permit. Grading permits require a Plot and Finished <br />Grading Plan prepared by a California -registered Civil Engineer. <br />c. Work requiring on-site shoring which affects the public right of way <br />d. Work using the public right-of-way for any fixed structure (awnings, roof overhangs, <br />fixed planters, etc.). Insurance, meeting the City's standards, is required. This permit <br />will be recorded against the property. <br />ATTY/RESO.0051 CC RESO APPROVING PROJECT— BROADWAY PLAZA RESO. NO. 15769 <br />REV: 05-15-19 PR MUFF No. 601 <br />Page 13 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.