My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:37 AM
Creation date
10/11/2019 8:01:33 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/20/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING AN ARCHITECTURAL PERMIT, PLANNED DEVELOPMENT PERMIT, USE PERMIT, VESTING TENTATIVE MAP, STATE DENSITY BONUS LAW CONCESSIONS AND AN AFFORDABLE HOUSING PLAN FOR THE BROADWAY PLAZA PROJECT LOCATED AT 1401 BROADWAY AND 2201 BAY ROAD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05/20/2019 <br />31. Undergrounding Utilities - The applicant shall underground all overhead utilities along Bay <br />Road between Chestnut and Woodside, across Woodside, and within the "Parcel 1" frontage of <br />the Bay Block, as that parcel is shown on the tentative map. This area includes the removal of <br />the first three poles past Woodside, with the undergrounding of all overhead lines connecting <br />to those poles, to the next off-site pole. Any existing streetlight currently mounted on a pole to <br />be removed shall be replaced in a similar location, in a style as determined by the City Engineer <br />and Planning Manager. The work to underground these lines shall be shown on the building <br />permit plans for each respective block. [SDR] [ENGINEERING] <br />32. Sewer Capacity - Prior to encroachment permit issuance, submit to the City, and obtain <br />approval of, an evaluation and report prepared by a licensed engineer demonstrating that the <br />existing sewer mains have sufficient capacity for the project. The study shall consider existing, <br />project, other approved projects, and applications currently under review in determining the <br />needed capacity. If the existing sewer main is less than 6" in size, or is in any other way not <br />sufficient as determined by the City Engineer, applicant shall, as part of the Project, construct <br />and install new sewer mains sufficient to meet such requirements, in accordance with the City's <br />Engineering standards and as directed by the City Engineer to the City Engineer's satisfaction. <br />The report shall evaluate the existing sewer mains at each connection to the City system (both <br />the existing system on Bay/Chestnut and the system on Broadway). [SDR] [ENGINEERING] <br />33. Peak Wet Weather Flow Capacity - Redwood City has exceeded its Peak Wet Weather Flow <br />(PWWF) capacity in the past. A methodology to reduce inflow and infiltration (1/1) by pipe <br />replacement was determined. The applicant shall reduce (I/1) to offset increased sewer <br />demand from the project by replacing aged sewer mains or pay an equivalent in -lieu fee. The <br />length of pipe replacement required or the amount of fee will be based on the project's sewage <br />generation projection (Attachment L of the City's Engineering Standards). For parcels within <br />Redwood City but connecting to County owned and maintained sewer, an 1/1 in -lieu fee may be <br />collected by Redwood City if the County does not require main replacement or collect and in - <br />lieu fee. [CCA] [ENGINEERING] <br />34. Sewer Lateral Limit - The project shall minimize the number of sewer laterals installed to <br />serve the project; with one lateral per building unless otherwise allowed by the City Engineer. <br />[CCA] [ENGINEERING] <br />34. Sewer Lateral Size for Commercial Development - For new or remodeled commercial <br />buildings, sewer laterals less than 4" shall be upgraded to a minimum 6" size. [SDR] <br />[ENGINEERING] <br />35. Water Main for Bay Block - The applicant shall, as part of the Project, design and construct a <br />new water main in Bay Road along the Bay Block frontage, in accordance with the City's <br />Engineering Standards and as directed by the City Engineer. The new water main shall be 8" <br />minimum in size and extend across the entire property frontage, beginning at the nearest point <br />of connection to an existing 6" or larger water main and ending at the Caltrans (Woodside) right <br />of way. Prior to encroachment permit issuance, the applicant shall submit to City, and obtain <br />approval of, an evaluation and report, prepared by a licensed engineer, in conformance with <br />the City's Engineering Standards, demonstrating that the proposed water main meets the <br />domestic and fire Flow requirements in accordance with City Code Section 38.26 and the <br />International Fire Code. [COA][ENGINEERING] <br />ATTY/RESO.0051 CC RESO APPROVING PROJECT—BROADWAY PLAZA RESO. NO. 15769 <br />REV: 05-15-19 PR MUFF NO. 601 <br />Page 14 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.