My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:37 AM
Creation date
10/11/2019 8:01:33 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/20/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING AN ARCHITECTURAL PERMIT, PLANNED DEVELOPMENT PERMIT, USE PERMIT, VESTING TENTATIVE MAP, STATE DENSITY BONUS LAW CONCESSIONS AND AN AFFORDABLE HOUSING PLAN FOR THE BROADWAY PLAZA PROJECT LOCATED AT 1401 BROADWAY AND 2201 BAY ROAD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05/20/2019 <br />36. Water Main for Broadway Block - The applicant shall, as part of the Project, design and <br />construct a new water main in Bay along the Broadway Block frontage and across the project <br />site to the existing water main in Broadway, to replace the existing water main located within <br />the project site. The new water main shall be designed and installed in accordance with the <br />City's Engineering Standards and as directed by the City Engineer- The new water main shall <br />be 8" minimum in size and extend across the entire property frontage, from the nearest point <br />of connection to an existing 6" or larger water main. Prior to encroachment permit issuance, <br />the applicant shall submit to City, and obtain approval of, an evaluation and report, prepared <br />by a licensed engineer, in conformance with the City's Engineering Standards, demonstrating <br />that the proposed water main meets the domestic and fire flow requirements in accordance <br />with City Code Section 38.26 and the International Fire Code. [COA][ENGINEERING] <br />37. Water Meters - The project shall provide one "master" water meter for domestic water service <br />and one "master" recycled water meter for each designated use within each building. Irrigation <br />shall be metered separately from all other uses. Tennant Improvement areas intended to be <br />used for retail, restaurants, personal services, business services, and entertainment uses, shall <br />be provided with a separate meter from the areas designed to use recycled water for internal <br />uses. Any metering for individual units must be accomplished by private sub -meters within <br />the property. [COA][ENGINEERING] <br />38. Recycled Water Main - The project shall install a new 16" HDPE recycled water main to serve <br />the recycled water needs of the site. The main shall connect to the existing recycled water main <br />in Marshall Street near Marshall Court and follow an alignmentto the project site as determined <br />by the City Engineer. The recycled water main shall extend across the entire property frontage <br />on Broadway, across Woodside Road within a casing, and to a terminus at the far edge of the <br />existing 25' Alley and public utility easement, approximately 110 linear feet beyond the <br />Caltrans right of way. The recycled water main shall be installed prior to the first Temporary <br />Certificate of Occupancy for any building on the Broadway Block. [COA] [ENGINEERING] <br />39. Recycled Water Facilities - Recycled water (purple pipe) facilities shall be provided and <br />designed in accordance with Engineering Standards for dual plumbing, irrigation, and other <br />warranted uses per the Recycled Water Ordinance, Chapter 38, and as identified in the Recycled <br />Water Development Standards. By state law, recycled water is not allowed in food preparation <br />areas. Recycled water may be used in childcare areas but is not required by City policy. <br />Services that are to be supplied by recycled water shall be designed to properly function at the <br />design pressure required by Engineering. The applicant shall connect the project to the <br />recycled water system prior to project acceptance. [SDR] [ENGINEERING] <br />40. Recycled Water Report - The applicant shall enter into a Recycled Water Use Agreement and <br />shall hire an engineer licensed in California and experienced in the field of wastewater <br />treatment to prepare a recycled water report for dual plumbed facilities, pursuant to California <br />Water Code section 13522.5 and in accordance with California Code of Regulations sections <br />60314 and 60323 (found within Title 22, Division 4, Chapter 3). The first draft of the report and <br />the signed agreement shall be submitted to Engineering prior to building permit issuance, and <br />will be routed to the Public Works Department for review and coordination. The report shall <br />be approved prior to building permit issuance for any building containing dual plumbing. [COA] <br />[ENGINEERING] <br />41. Cross -Connection Control Test - Prior to issuance of the certificate of occupancy, all <br />applicable plumbing systems must pass a cross -connection control test, performed by a Cross- <br />ATTY/RESO.0051 CC RESO APPROVING PROJECT—BROADWAY PLAZA RESO. NO. 15769 <br />REV: 05-15-19 PR MUFF NO. 601 <br />Page 15 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.