My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:37 AM
Creation date
10/11/2019 8:01:33 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/20/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING AN ARCHITECTURAL PERMIT, PLANNED DEVELOPMENT PERMIT, USE PERMIT, VESTING TENTATIVE MAP, STATE DENSITY BONUS LAW CONCESSIONS AND AN AFFORDABLE HOUSING PLAN FOR THE BROADWAY PLAZA PROJECT LOCATED AT 1401 BROADWAY AND 2201 BAY ROAD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05/20/2019 <br />Connection Control Specialist Certified through the CA -NV Section of the AWWA and observed <br />by Public Works staff. The cross -connection control test method must be included in the <br />Recycled Water Report. The applicant is responsible for all fees associated with the <br />performance of the cross -connection control test. [COA] [ENGINEERING] <br />42. Discharge Permit for Subterranean Garages - If the subterranean garage requires <br />groundwater pumping into the sewer system, a Discharge fee will apply and a Discharge Permit <br />will be required by Silicon Valley Clean Water (SCVW) prior to issuance of the building permit. <br />[SDR][ENGINEERING] <br />43. Backflow Protection - Backflow protection on all water services is required. The backflow <br />preventer shall be above grade and located on private property as close as practicable to the <br />water meter, and accessible to the Public Works Department for testing. [CCA] [ENGINEERING] <br />44. Fire Flow - The Project shall meet fire flow requirements as established by the Fire Department <br />which are based on the Fire Code. Fire flow tests are typically performed duringthe preliminary <br />design phase but must be completed prior to submittal of final design. Applicant shall contact <br />the Fire Department for Fre flow requirements, and then submit a written fire flow test request <br />to Engineering. [COA][ENGINEERING] <br />4S. C3 Requirements - Plans shall be designed to meet C3 requirements of the Municipal <br />Regional Permit (MRP) NPDES Permit CAS612008 and be in compliance with San Mateo <br />County C.3 Stormwater Technical Guidance. [SDR] [ENGINEERING] <br />a. Treatment Controls -Treatment measures to be shown on final improvement or grading <br />plans shall not differ materially from the treatment measures presented on the project's <br />Vesting Tentative Map, without written approval from the Engineering Department. <br />b. Treatment Measure Inspection - Applicant shall coordinate installation of stormwater <br />treatment measures with the municipality, shall arrange to have the City's designated <br />inspector present at the time of installation, and shall have the City's designated inspector <br />complete a final inspection of installed stormwater treatment measure immediately after <br />installation is complete. <br />46. Stormwater Management Plan (SWMP) - Applicant shall prepare a SWMP that includes, at <br />a minimum, exhibit(s) showing drainage areas and location of Low Impact Development (LID) <br />treatment measures; total project site area and total area of land disturbed; total new and/or <br />replaced impervious area; treatment measures and hydraulic sizing calculations; a listing of <br />source control and site design measures to be implemented at the site; saturated hydraulic <br />conductivity rate(s) at relevant locations or hydrologic soil type (A, B, C or D) and source of <br />information; elevation of high seasonal groundwater table; and a brief summary of how the <br />project is complying with Provision C.3 of the MRP. [COA][ENGINEERING] <br />47. Construction General Permit - For construction activity resulting in a land disturbance of <br />one acre or more, applicant shall file a Notice of Intent (N01) with the State Water Resources <br />Control Board under the Construction Activities Storm Water General Permit (General Permit). <br />The N01 indicates the applicant's intent to comply with the San Mateo Countywide Stormwater <br />Pollution Prevention Program, including a Stormwater Pollution Prevention Plan (SWPPP). <br />[SDR] [ENGINEERING] <br />ATTY/RESO.0051 CC RESO APPROVING PROJECT— BROADWAY PLAZA RESO. NO. 15769 <br />REV: 05-15-19 PR MUFF No. 601 <br />Page 16 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.