My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:37 AM
Creation date
10/11/2019 8:01:33 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/20/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING AN ARCHITECTURAL PERMIT, PLANNED DEVELOPMENT PERMIT, USE PERMIT, VESTING TENTATIVE MAP, STATE DENSITY BONUS LAW CONCESSIONS AND AN AFFORDABLE HOUSING PLAN FOR THE BROADWAY PLAZA PROJECT LOCATED AT 1401 BROADWAY AND 2201 BAY ROAD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05/20/2019 <br />48. Stormwater BMPs - Stormwater Pollution Prevention Program Best Management Practices <br />(BMPs) for construction shall be implemented to protect water quality, in accordance with the <br />approved Stormwater Pollution Prevention Plan (SWPPP). BMP plan sheets are available <br />electronically for inserting into project plans. [SDR][ENGINEERING] <br />Street Infrastructure Improvements <br />49. Streetlights - Traffic scale (cobra -head style) and pedestrian (post -top style) street lights shall <br />be installed along all project frontages within the City right of way. The style and location of all <br />streetlights shall be as determined by the City Engineer and Planning Manager. <br />[SDR][ENGINEERING] <br />50. Repair or Replace Street Infrastructure - Restore streets surrounding the project site to the <br />satisfaction of the City Engineer at project completion. When this requires additional pavement <br />restoration, the Engineer shall approve the preferred layout of pavement markings. <br />[SDR][ENGINEERING] <br />51. Reconstruction of Frontage Streets -The following pavement restoration has been identified <br />for the streets surrounding the project site. The restoration indicated is a minimum <br />requirement and further restoration may be needed if the existing pavement is negatively <br />impacted bythe construction of the project: [COA][ENGINEERING] <br />a. Chestnut Street: Spot repair and overlay from curb to curb, excluding the area between the <br />curbs of the train tracks. <br />b. Broadway from Chestnut to Woodside: Spot repair and overlay on the project side of the <br />street if the recycled water main alignment is on the project side. Spot repair and overlay <br />from curb to curb if the recycled water main alignment is on the other side of the <br />centerline. <br />c. Bay from Chestnut to Woodside: Spot repair and overlay curb to curb. <br />d. Bay from Woodside to County limit: Spot repair and overlay. <br />e. Bay within County limit: As determined by the County. <br />52. Parking Garage Ramps - Parking garage ramps shall meet the Design Criteria of the <br />Engineering Standards and consider safety and visibility of pedestrians to the satisfaction of <br />the City Engineer. Access controls shall be designed and placed in such a way that vehicles do <br />not block the public sidewalk or queue in the public right-of-way. The access control system <br />shall be delineated in the building permit submittal. Person doors with panic hardware and <br />alarms shall be installed at or adjacent to gates between private and public parking to allow the <br />safest emergency egress path of travel. [SDR][ENGINEERING] <br />53. Shoring for Excavations - No tiebacks shall extend into the public right of way or onto <br />adjacent properties without the written agreement of the City and/or private property owner. <br />Any tie -backs within the City's right of way shall be de -tensioned prior to permit sign -off <br />and/or project acceptance. [COA] [ENGINEERING] <br />Fire and Safetv <br />54. Radio Coverage for Emergency Responders -The project is required to have an Emergency <br />Responder Radio Communications System (ERRCS) installed in accordance with CFC 510. The <br />ATTY/RESO.0051 CC RE50 APPROVING PROJECT—BROADWAY PLAZA RESO. NO. 15769 <br />REV: 05-15-19 PR MUFF NO. 601 <br />Page 17 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.