My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:37 AM
Creation date
10/11/2019 8:01:33 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/20/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING AN ARCHITECTURAL PERMIT, PLANNED DEVELOPMENT PERMIT, USE PERMIT, VESTING TENTATIVE MAP, STATE DENSITY BONUS LAW CONCESSIONS AND AN AFFORDABLE HOUSING PLAN FOR THE BROADWAY PLAZA PROJECT LOCATED AT 1401 BROADWAY AND 2201 BAY ROAD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05/20/2019 <br />system needs to be a campus -wide system with one set of bi-directional amplifiers with <br />coverage extended into all levels of all buildings and garages. This signal distribution is typically <br />accomplished with fiber optics. [COA] [FIRE] <br />55. Fire Department Knox Building Access - Knox Key boxes are required as part of this project <br />to allow emergency access for firefighters to all buildings. Indicate on the pains that Knox Key <br />boxes will be provided at the entrances to all buildings at locations approved by the fire <br />department. Recessed key boxes shall be installed at all buildings five to six feet above finished <br />grade. [SDR- CFC 506][FIRE] <br />56. Fire Apparatus Turn Arounds - Are required at the end of all Fire Access Lanes in excess of <br />150 feet. These turnarounds shall meet the City of Redwood City engineering standards. [SDR - <br />D103.4] [FIRE] <br />57. Access Roads - Fire apparatus access roads shall be designed and maintained to support the <br />imposed loads of fire apparatus and shall be surfaced so as to provide all weather driving <br />capabilities. Fire access lanes shall be engineered to carry the imposed load of 75,000 pounds <br />and be surfaced with AC or Concrete. Concrete may be stamped or pervious as long as it meets <br />the load bearing requirements. [SDR -503.2.3] [FIRE] <br />58. Aerial Apparatus - At least one of the required aerial fire apparatus access routes meeting this <br />condition shall be located within a minimum of 15 feet and a maximum of 30 feet from each <br />building, and shall be positioned parallel to one entire side of each building as per 2016 CFC <br />D105.3. [FIRE] <br />59. No Parking -The plans indicate a number of Red Curb fire lane designations. In addition to red <br />curbs, appropriate Fire Lane No Parking signs are required as per Appendix D of the CFC. [FIRE] <br />60. Atrium Smoke Removal System - The plans indicate a three story Atrium in one of the <br />buildings. Provide engineered plans and air handling calculations for the required smoke <br />removal system for the Atrium. [FIRE] <br />61. Available Water Supply to Project Site - Provide current fire flow information from the water <br />purveyor to indicate the maximum available water flow in gallons per minute (GPM) at a <br />minimum of 20 pounds per square inch (psi) residual pressure. This Information must be dated <br />and indicate the information is the most current information available from the water <br />purveyor. [FIRE] <br />62. Automatic Fire Sprinkler / Standpipe Systems Required - As the proposed buildings are <br />four or more stories in height, all of the buildings and garage areas are required to be equipped <br />with automatic standpipe / fire sprinkler systems. Provide plans and hydraulic calculations for <br />the design of these systems. The plans for these systems shall include on-site exterior standpipe <br />connections and interior standpipe connections in all of the buildings stairwells that need to be <br />included in the hydraulic calculations. The plans indicate a number of exterior standpipe <br />connections around the campus. The fire pumps supplying these standpipe connections are <br />required to be sized to provide the required total 1000 GPM flow at 125 Psi at the highest <br />elevation standpipe connections. [FIRE] <br />63. Fire Department Connections - FDC's to the fire sprinkler / standpipe systems shall be <br />located at the fire access side of all buildings within 50 feet of a Fire Hydrant. [FIRE] <br />ArFY/RESO.0051 CC RESO APPROVING PROJECT— BROADWAY PLAZA RESO. NO. 15769 <br />REV: 05-15-19 PR MUFF NO. 601 <br />Page 1S of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.