My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:37 AM
Creation date
10/11/2019 8:01:33 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/20/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING AN ARCHITECTURAL PERMIT, PLANNED DEVELOPMENT PERMIT, USE PERMIT, VESTING TENTATIVE MAP, STATE DENSITY BONUS LAW CONCESSIONS AND AN AFFORDABLE HOUSING PLAN FOR THE BROADWAY PLAZA PROJECT LOCATED AT 1401 BROADWAY AND 2201 BAY ROAD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05/20/2019 <br />for the duration of construction. The sign shall include, at minimum, the following information: <br />project name & address, elevation or rendering, construction manager (name, phone number), <br />anticipated completion (season, year), and the City's permitting website <br />http://permits.redwoodcity.or2 [COA][PLANNING] <br />73. Construction Meetings - The applicant is required to contact the Permit Counter <br />(650.780.7350) to schedule the following meetings prior to or during construction. <br />[COA] [BUILDING] <br />a. Pre -Submittal - Prior to building permit submittal, schedule a pre -submittal meeting <br />with Building, Planning, Engineering and Fire staff to discuss the permitting process and <br />submittal requirements. <br />b. Pre -Construction - After City permits are issued, but prior to start of construction, <br />schedule a pre -construction meeting with Engineering, Building, Fire, and Planning staff <br />to discuss the inspection process and requirements for construction and site work. The <br />applicant shall arrange forthe attendance of the owner, developer, construction manager, <br />contractor, and all subcontractors who are responsible for grading and erosion and <br />sedimentation protection controls. <br />c. Interior Finishes & Amenities - After sheetrock inspection but prior to installation, <br />contact the Project Planner and Housing Staff to verify, to the City's satisfaction, that all <br />interior finishes and amenities in the affordable units are equivalent to amenities used in <br />market rate units. <br />74. Construction Management and Staging - Prior to encroachment permit issuance, submit a <br />construction parking management plan, which shall outline the number of construction <br />workers by phase, phase duration, where parking will be located for each phase. Construction <br />parking, material storage, equipment, or other construction -related uses are not allowed within <br />the City right of way without prior approval from the City Engineer. [COA] [ENGINEERING] <br />75. Lane Closures -Traffic control for lane closures shall conform to the Work Area Traffic Control <br />Handbook. Street closures require submission of traffic control plans and approval in advance. <br />[SDR][ENGINEERING] <br />76. Grading - Grading shall be performed in accordance with the City's Engineering Standards. <br />Soil or other construction materials shall not be stockpiled in the public right-of-way. Submit <br />cut/fill volumes (CY) for all soils to be imported to or exported from the site. <br />[SDR][ENGINEERING] <br />77. Monitoring - The Soils Engineer shall conduct continuous site inspections during trenching <br />and backfill operations at the applicant's expense. The Soils Engineer shall take compaction <br />tests and submit the results to Engineering & Construction. [SDR][ENGINEERING] <br />78. Winterizing - If construction is not complete by the start of the wet season (October 1 through <br />April 30), implement a winterization program to minimize the potential for erosion and <br />sedimentation. As appropriate to the site and status of construction, winterization <br />requirements shall include inspecting/maintaining/cleaning all soil erosion and sedimentation <br />controls prior t0, during, and immediately after each storm event; stabilizing disturbed soils <br />through temporary or permanent seeding, mulching, matting, tarping or other physical means; <br />ATTY/RESO.0051 CC RESO APPROVING PROJECT — BROADWAY PLAZA RESO. No. 15769 <br />REV: 05-15-19 PR MUFF NO. 601 <br />Page 20 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.