My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res07 14769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res07 14769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:56:07 AM
Creation date
10/11/2019 9:55:53 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
3/26/2007
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR THE REDWOOD CITY DOWNTOWN PRECISE PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
p MONITORING ___. VERIFICATION <br />.». <br />IDEND IMPACT <br />RELATED MITIGATION MEASURE <br />implementation <br />Monitoring and <br />Timing <br />Signature <br />Date <br /> Enti Verff[cation Enti Re uirements <br />v m southbound left toms (Mitigations 9-3(aJ or <br />O 9-3(bJ), or the impact on pedestrian signal <br />Z7 sequencing with split phase signal <br />~ operation {Mitigation 9-3(cn, may potentially <br />~ degrade the Downtown pedestrian <br /> environment and decrease pedestrian <br />p safety, comfort, and convenience; and be ,, <br />~ inconsistent with existing and proposed City <br />W <br />polices giving priority to the Downtown <br /> pedestrian environment; the City may <br /> choose to avoid the three mitigation options <br /> identified above in the interest of protecting <br /> the pedestrian environment. This choice <br /> would result in a sfgnificanf unavoidable <br /> impact under the current CEQA and City <br /> criteria for "Intersection Im acts." <br />impact 9-4: Impact on Broadway/Jefferson Mitigation 9-4. Add an exclusive City; fair-share City If and when improvements <br />Avenue intersection--Maximum Intensity northbound left-turn lane on Broadway, and reimbursement adopted, City shall conduct <br />Precise Plan Alternative. During the PM convert the existing northbound shared left- from future annual traffic monitoring at <br />the Maximum Intensity project <br />peak hour through right lane into a shared individual this intersection and <br />, <br />traffic increment would reduce operation to through right-turn lane. These changes <br />would result in an acceptable LOS D under project <br />applicants. implement fair-share <br />requirement when level of <br />LOS F and increase average delay by more <br />than five {5} seconds at the Broadway/ the Maximum Intensity alternative, thereby service reaches LOS E <br />Jefferson Avenue intersection. This change reducing this impact to a less-than- (average delay of greater than <br />would represent a significant impact, significant level. 55 seconds). <br /> or <br /> Because this mitigation would result in the <br /> loss of sidewalk at corner bulb-outs, <br /> degrading the existing and future <br /> pedestrian environment and sidewalk <br /> dining opportunities, and would therefore <br /> be inconsistent with City policies giving <br /> priority to the Downtown pedestrian <br /> environment, the City may choose to avoid <br /> these intersection modifications in the <br /> interest of protecting the pedestrian <br /> environment. This choice would result in a <br /> sfgnificani unavoidable impact under <br /> current CEQA and City criteria for <br /> "intersection Im acts." <br />Imps 9-5: impact BroadwaylMiddlefieid Mitigation 9-5. The intersection of City; fair-share City if and when improvements <br />Roar~jttersection-Maximum Intensity Broadway/Middlefield Road is currently a 4- reimbursement adopted, City shall wnduct <br />t <br />it <br />i <br />l t <br />ff <br />~e~lan Alternative. During the PM <br />Prec way stop controlled facility. Signalizing the from future ng a <br />annua <br />ra <br />ic mon <br />or <br />thi <br />i <br />t <br />ti <br />d <br />, <br />peaNfl>fowl the Maximum Intensity project intersection (2-phase control) would result individual <br />t s <br />n <br />ersec <br />on an <br />implement fair-share <br />traffiy~ ment would reduce operation to <br />LOSE increase average delay by more in LOS B operations under Maximum <br />Intensity conditions. implementation of this projec <br />applicants. requirement when level of <br />W <br />N <br />v <br />N <br />O <br />v <br />Page 9 U:IMy Documen?siDownfown Precise P;an',.GG staflreoo, s1CC 3.14.doct3. 12.07 ExhibitslAt?achment A mitmon;?orrng c~etk!ist E55.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.