My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-11-19
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-11-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2007 9:18:44 AM
Creation date
11/15/2007 12:42:24 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
11/19/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1. Density and the Role of Infill Development <br />2. Boulevard Building and Frontage Design <br />3. Interface with Adjacent Properties <br />4. Architectural Form and Character <br /> <br />ATTACHMENT 5 7 A <br />Page 47 <br /> <br />The project as redesigned remains consistent with the overall vision and policy direction <br />of the Precise Plan. The project will continue to provide much needed intill housing, <br />including six affordable units close to transit. The project's redesign will also continue to <br />enhance the Woodside Road corridor and improve pedestrian circulation and safety. In <br />addition, the project's redesign will result in an improved interface with adjacent single- <br />family residential homes to the rear. The architectural integrity of the project also <br />remains intact and has been recommended for approval by the Architectural Review <br />Committee. Refer to Attachment C for Precise Plan revisions, including the Precise <br />Plan's Mitigation, Monitoring and Reporting Checklist. <br /> <br />The project's revised Woodside Road access, reduced height and increased setbacks <br />and privacy provisions also do not affect the validity of the environmental review, in that <br />the "building envelope" of the project analyzed in the adopted Mitigated Negative <br />Declaration was for a five-story residential development with 43 units. The project <br />revisions are designed to lessen the already less than significant impacts associated <br />with the building envelope and furthermore, the redesign results in improved <br />neighborhood design context and solar access for adjacent single-family homes. <br /> <br />Planned Community Permits and Vestinq Tentative Map: The applicant requests a <br />Planned Community (PC) Permit. Staff recommends that the Planning Commission <br />approve the PC Permit contingent upon Council approval ot the proposed rezoning and <br />revised Precise Plan and subject to implementation of the conditions of approval <br />contained in the revised Precise Plan, including the MMRP. <br /> <br />The applicant also requests Planning Commission approval of the Vesting Tentative <br />Map in order to allow for the 43 residential units to be for-sale condominiums. The <br />applicant will prepare CC&Rs to establish, among other things, responsibilities for <br />shared common areas including, but not limited to, open space and landscape <br />amenities and the parking garage. Staff recommends that the Planning Commission <br />approve the Vesting Tentative Map subject to the conditions of approval contained in <br />the revised Precise Plan, including the MMRP, and Attachment E (Draft Conditions of <br />Approval for Tentative Map). <br /> <br />GENERAL PLAN AND ZONING COMPLIANCE <br />General Plan: With 43 units, the project density is proposed to be 65 units/acre. The <br />General Plan allows development to exceed the maximum allowable residential density <br />of 40 units/acre if it is part of a Precise Plan and if the project demonstrates three or <br />more of the following features: <br />1. Superior mixed use design <br />2. Incorporation of affordable housing <br />3. Incorporation of public or community facilities <br />4. Efficient and innovative use of infrastructure and nonrenewable resources <br />5. Transportation demand management (TOM) <br />6. Innovative use of shared parking <br />
The URL can be used to link to this page
Your browser does not support the video tag.