My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord95 2102
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
Ordinances
>
1990-1999
>
Ord95 2102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 3:06:43 PM
Creation date
10/11/2019 3:06:40 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Agency Type
City Council
Date
11/27/1995
Description
ORDINANCE NO. 2102 ORDINANCE REPEALING ARTICLES IV, V, VI, VII, AND VIII OF CHAPTER 9 OF THE CODE OF THE CITY OF REDWOOD CITY; ADDING ARTICLES IV, V, VI, VII, AND VIII OF CHAPTER 9 TO THE CODE OF THE CITY OF REDWOOD CITY RELATING TO THE ESTABLISHMENT OF REGULATIONS AND STANDARDS FOR BUILDINGS AND STRUCTURES IN THE CITY OF REDWOOD CITY AND ADOPTING BY REFERENCE THE FOLLOWING CODES: "THE UNIFORM BUILDING CODE 1994 EDITION"; "THE UNIFORM BUILDING SECURITY CODE, 1994 EDITION"; "THE UNIFORM HOUSING CODE, 1994 EDITION"; "THE UNIFORM MECHANICAL CODE, 1994 EDITION"; "THE UNIFORM PLUMBING CODE, 1994 EDITION"; AND "THE NATIONAL ELECTRICAL CODE, 1993 EDITION" "ARTICLE IV. BUILDING CODES" THE COUNCIL OF REDWOOD CITY DOES ORDAIN AS FOLLOWS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Additional building sewer cleanouts shall be installed at intervals not to <br /> exceed one hundred (100) feet (30.4 m) in straight runs and for each aggregate <br /> horizontal change in direction exceeding one hundred thirty-five (135) degrees. <br /> "Section 719.2. When a building sewer or a branch thereof does not <br /> exceed ten (10) feet (3 m) in length and is a straight line projection from a <br /> building drain which is provided with a cleanout, no cleanout will be required at <br /> its point of connection to the building drain. <br /> "Section 719.3. All required building sewer cleanouts shall be extended <br /> to grade. When building sewers are located under buildings, the cleanout <br /> requirements of Section 707.0 shall apply. <br /> "Section 719.4. Each cleanout shall be installed so that it opens to allow <br /> cleaning in the direction of flow of the soil or waste or at right angles thereto, and <br /> except in the case of wye branch and end-of-line cleanouts, shall be installed <br /> vertically above the flow line of the pipe. <br /> "Section 719.5. Cleanouts installed under concrete or asphalt paving <br /> shall be made accessible by yard boxes, or extending flush with paving with <br /> approved materials and be adequately protected. <br /> "Section 719.6. Approved manholes may be installed in lieu of cleanouts <br /> when first approved by the Administrative Authority. The maximum distance <br /> between manholes shall not exceed three hundred (300) feet (91.4 m). <br /> ORD-001 21 <br /> FXS:rg <br /> 10/23/95 <br /> 11/13/95R <br />
The URL can be used to link to this page
Your browser does not support the video tag.