My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-10-28 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-10-28 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:14:56 PM
Creation date
10/25/2019 8:11:45 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/28/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.13. - Page 41 of 63 <br />panel capacity, overprotection device, a minimum 1" diameter raceway that may <br />include multiple circuits as allowed by the California Electrical Code, wiring, and <br />either a) a receptacle labelled "Electric Vehicle Outlet" with at least a '/2" font <br />adjacent to the parking space, or b) electric vehicle supply equipment (EVSE). <br />LEVEL 2 EV READY CIRCUIT: A parking space served by a complete electric <br />circuit with 208/240 volt, 40 -ampere capacity including electrical panel capacity, <br />overprotection device, a minimum 1" diameter raceway that may include multiple <br />circuits as allowed by the California Electrical Code, wiring, and either a) a <br />receptacle labelled "Electric Vehicle Outlet" with at least a'/2" font adjacent to the <br />parking space, or b) electric vehicle supply equipment (EVSE) with a minimum <br />output of 30 amperes. <br />ELECTRIC VEHICLE CHARGING STATION (EVCS): A parking space that <br />includes installation of electric vehicle supply equipment (EVSE) with a minimum <br />output of 30 amperes connected to a Level 2 EV Ready Circuit. EVCS installation <br />may be used to satisfy a Level 2 EV Ready Circuit requirement. <br />Sec. 9.234. - SECTION 4.106.4 OF THE GREEN BUILDING STANDARDS CODE <br />AMENDED: <br />Section 4.106.4 of the Green Building Standards Code is amended to read as follows: <br />4.106.4 Electric vehicle (EV) charging for new construction. New construction shall <br />comply with Sections 4.106.4.1 and 4.106.4.2 to facilitate future installation and <br />use of EV chargers. <br />EXCEPTIONS to 4.106.4: <br />1. Where there is no commercial power supply. <br />2. Accessory Dwelling Units (ADU) and Junior Accessory Dwelling Units <br />(JADU) without additional parking facilities. <br />Sec. 9.235. - SECTION 4.106.4.1 OF THE GREEN BUILDING STANDARDS CODE <br />AMENDED: <br />Section 4.106.4.1 of the Green Building Standards Code is amended to read as follows: <br />4.106.4.1 New one- and two-family dwellings and townhouses with attached <br />private garages. For each dwelling unit, install a Level 2 EV Ready Circuit and <br />Level 1 EV Ready Circuit. <br />Exception: For each dwelling unit with only one parking space, install a Level 2 EV <br />Ready Circuit. <br />Sec. 9.236. - SECTION 4.106.4.2 OF THE GREEN BUILDING STANDARDS CODE <br />AMENDED: <br />Section 4.106.4.2 of the Green Building Standards Code is amended to read as follows: <br />ATTY/ORD.504/CC ORDINANCE ADDING CALIFORNIA ENERGY CODE & GREEN BUILDING STANDARDS <br />REV: 10-24-19 RL <br />Page 13 of 18 <br />185 <br />
The URL can be used to link to this page
Your browser does not support the video tag.